West Harbour, Auckland · Auckland
From the council’s rating records and the other sources noted on hover. Bedrooms and bathrooms may come from a past listing. Built is the decade the valuer records.
Owners and the parties to each instrument are not published on this page. Order the record of title to see them.
Selling this property, or the agent for it? Import the listing from your agency's site or a portal and it appears here, free: photos, price, open homes and your details, beside the council record buyers are already reading.
We hold no building consents for this property yet. The council may hold records we have not seen.
What the council has been asked to allow under the Resource Management Act. 4 on this property · 14 land use or subdivision consents within 250 m.
Community Facilities - Redevelopment of an existing playground at Moire Reserve involving earthworks and vegetation alteration and r emoval.
To construct a new wastewater connection within Moire Park from manhole MH7 to manhole EX AA/1. The pipe will be 26m long, 150mm in diameter, and installed at a depth of approximately 2.7m. The pipe is to be installed via an open cut trench which will follow the existing public path within the park, and will require a total of 15m³ of earthworks over an area of 25m², as well as 5m² of vegetation removal.
The duplication of an existing wastewater main, including a pipebridge, earthworks and vegetation clearance in an SEA
The duplication of an existing wastewater main, including a pipebridge, earthworks and vegetation clearance in an SEA
The applicant seeks consent to change land use condition 1 General conditions , conditions 4 Landscaping and subdivision conditions 1 General conditions , condition 12 Section 224c Certificate and consent notice 20 in order to allow for increasing building height of each unit and change the paving materials of the parking spaces.
The applicant seeks consent to change land use condition 1 General conditions , conditions 4 Landscaping and subdivision conditions 1 General conditions , condition 12 Section 224c Certificate and consent notice 20 in order to allow for increasing building height of each unit and change the paving materials of the parking spaces.
The removal of existing structures and vegetation and the construction of six new 2 level dwelling units with associated earthworks and site development including a six lot freehold subdivision.
The removal of existing structures and vegetation and the construction of six new 2 level dwelling units with associated earthworks and site development including a six lot freehold subdivision.
To construct six new dwellings with associated site works and subdivision.
To construct six new dwellings with associated site works and subdivision.
Ministry for the Environment, National Monitoring System, July 2014 to June 2025. All resource consents
If it is yours, claiming it puts the council record, the title and what it costs you to hold in one place — and lets you put your lending, insurance and power out to people who compete for them.
We check your name against the registered owner on the title before a claim is accepted. Nothing on this page changes for anyone else, and no provider is contacted until you ask.
What the council's published maps say about this land. A map is a model of a storm, not a record of one: a LIM or a flood report says more.
Part of this property is inside a mapped flood area.
District plan zones as Auckland publishes them. What a site may be used for, and what may be built on it.
Land the council models as under water in a 1-in-100-year storm, usually with an allowance for climate change.
A low point where stormwater ponds if its outlet blocks or overflows.
Land beside a flood plain that could flood if the model is out, or the storm is bigger.
Land the sea reaches in a 1-in-100-year storm tide once sea level has risen by 1 m.
Streets whose built character is protected: demolition and new building are assessed against the area's existing form, whatever the zone allows.
A scheduled historic place. Work on it, including demolition, needs consent against the heritage schedule.
An explicit building height for this land, replacing the one its zone would give.
A protected view of a volcanic cone. Inside it, building height is capped at a fixed level above sea level to keep the cone visible.
A locally protected view of a cone, with its own height ceiling.
The protected view of the Auckland War Memorial Museum.
Skyline land where building height is controlled so the ridge stays a ridge.
A scheduled tree. It may not be felled or topped without consent, which makes it a permanent part of the skyline.
A scheduled stand of trees, protected as a group.
Local rules written for this area alone, which override the underlying zone where they differ.
Source: Auckland Council (CC BY 4.0)
Counts describe the records we hold for this territorial authority, not a market forecast. OwnBetter has no estimate for this property. Every council figure on this page can be checked against the council's own record.
People whose office is within 5 km of West Harbour, nearest first. Taken from the REA public register -- not ranked by sales, and nobody pays to appear here.
Land and title information sourced from Toitū Te Whenua Land Information New Zealand. Rating valuations from the relevant territorial authority. No ownership or mortgage information is published on this page.
A single search across NZ property records finds other titles in your name and in companies you are a director of. Most owners find at least one they had forgotten was held somewhere else.