Westhaven, Auckland · Auckland
94 Shelly Beach Road: Auckland Council issued an earthquake-prone building notice on 3 Jun 2020. Seismic work is due by 3 Jun 2055.
94 Shelly Beach Road: Auckland Council issued an earthquake-prone building notice on 3 Jun 2020. Seismic work is due by 3 Jun 2055.
94 Shelly Beach Road: Auckland Council issued an earthquake-prone building notice on 3 Jun 2020. Seismic work is due by 3 Jun 2055.
94 Shelly Beach Road: Auckland Council issued an earthquake-prone building notice on 3 Jun 2020. Seismic work is due by 3 Jun 2055.
94 Shelly Beach Road: Auckland Council issued an earthquake-prone building notice on 3 Jun 2020. Seismic work is due by 3 Jun 2055.
Sign in to keep private notes on this property and record what you think it is worth.
Estimates from the floor area and typical New Zealand prices, not quotes. Power, gas and internet details from the Electricity Authority and Gas Industry Co registries and Chorus.
Unity Credit Union4.99%s
First Credit Union5.29%sPrincipal and interest at the lowest advertised card rate, held for the whole loan — no New Zealand rate is. A guide, not a lending offer or financial advice.
From the council’s rating records and the other sources noted on hover. Bedrooms and bathrooms may come from a past listing. Built is the decade the valuer records.
Owners and the parties to each instrument are not published on this page. Order the record of title to see them.
Selling this property, or the agent for it? Import the listing from your agency's site or a portal and it appears here, free: photos, price, open homes and your details, beside the council record buyers are already reading.
We hold no building consents for this property yet. The council may hold records we have not seen.
What the council has been asked to allow under the Resource Management Act. 41 on this property · 13 land use or subdivision consents within 250 m. 11 here are worth reading: declined, notified or not yet decided.
The construction of six new dwellings on the site, associated earthworks and installation of services as well landscaping.
The construction of six new dwellings on the site, associated earthworks and installation of services as well landscaping.
Construction of a new wastewater trunk sewer from Marine Parade to Point Erin Park via tunnel boring machine underneath the road and local connections to the existing engineering overflow points.
Construction of a new wastewater trunk sewer from Marine Parade to Point Erin Park via tunnel boring machine underneath the road and local connections to the existing engineering overflow points.
Construction of a new wastewater trunk sewer from Marine Parade to Point Erin Park via tunnel boring machine underneath the road and local connections to the existing engineering overflow points.
To construct a replacement playground within the Point Erin Pools complex and complete ancillary land disturbance and tree works.
Diversion of Groundwater The Project involves the construction, commissioning, operation and maintenance of a wastewater interceptor and associated activities at Point Erin Park in Herne Bay.
To Air The Project involves the construction, commissioning, operation and maintenance of a wastewater interceptor and associated activities at Point Erin Park in Herne Bay
The Project involves the construction, commissioning, operation and maintenance of a wastewater interceptor and associated activities at Point Erin Park in Herne Bay. Regional earthworks are required in two separate areas terminal shaft construction area and control chamber construction area across the site to enable the extension of the central interceptor to the termination point at the subject site. The total volume of earthworks over the two areas is approximately 12,500m3 over 5,030m2. T
Stormwater The Project involves the construction, commissioning, operation and maintenance of a wastewater interceptor and associated activities at Point Erin Park in Herne Bay.
To construct a second storey room over the back section of the dwelling in the form of belvedere.
Additions and alterations to the existing dwelling, a new swimming pool and converting the existing garage to a pool house.
To subdivide the site into two lots around an existing relocated dwelling and a new dwelling in the Single House Zone and Special Character Area Overlay – Residential Isthmus A as approved under LUC60377298
To undertake additions and alterations to an existing dwelling and construct a new dwelling both with basement parking and swimming pools associated earthworks and diversion and dewatering of groundwater and landscaping
To undertake additions and alterations to an existing dwelling and construct a new dwelling both with basement parking and swimming pools associated earthworks and diversion and dewatering of groundwater and landscaping
Construction of six terrace houses, a new vehicle crossing, a common accessway and a subdivision in accordance with the land use res ource consent
Construction of six terrace houses, a new vehicle crossing, a common accessway and a subdivision in accordance with the land use resource consent
Construction of six terrace houses, a new vehicle crossing, a common accessway and a subdivision in accordance with the land use res ource consent
Alterations to a dwelling in the Special Character Area. New shed and pool. Landscaping.
Condition 5 - Stormwater requires a detention tank to maintain peak discharge levels as the stormwater is being discharged to the combined network. The requested change is to remove the requirement for detention.
To vary condition 1 & 102 of resource consents LUC60319406, CST60319409, WAT60319451 and DIS60319407 (BUN60319388) being to update the consented plans for a change in alignment of the final section of the pipeline and outfall and to account for a change in construction methodology.
To vary condition 1 & 102 of resource consents LUC60319406, CST60319409, WAT60319451 and DIS60319407 (BUN60319388) being to update the consented plans for a change in alignment of the final section of the pipeline and outfall and to account for a change in construction methodology.
To vary condition 1 & 102 of resource consents LUC60319406, CST60319409, WAT60319451 and DIS60319407 (BUN60319388) being to update the consented plans for a change in alignment of the final section of the pipeline and outfall and to account for a change in construction methodology. LUC60319406-A is a master application to add time charge.
To vary condition 1 & 102 of resource consent to change to the outfall alignment portion of the St Marys Bay to Masefield Beach storage pipeline. Construction of the pipeline requires the taking of water during construction and diverting groundwater post construction.
Condition 1 of resource consent LUC60339675- This consent shall be carried out in accordance with the documents and drawings and all supporting additional information submitted with the application, detailed below, and all referenced by the council as resource consent number SBU60342099.
Conditions 1 and 3 of resource consent SUB60342099-This consent shall be carried out in accordance with the documents and drawings and all supporting additional information submitted with the application, detailed below, and all referenced by the council as resource consent number SBU60342099
Condition 1 of resource consent LUC60339675- This consent shall be carried out in accordance with the documents and drawings and all supporting additional information submitted with the application, detailed below, and all referenced by the council as resource consent number SBU60342099. Everything to be charger to the SUB60342099-A
Construction of two new dwellings, boundary adjustment and two-lot subdivision
Construction of two new dwellings, boundary adjustment and two-lot subdivision
Alterations and additions to the existing dwelling, new studio accessory building, and a new guest house to be established as a second dwelling
Discharges of contaminants to air, land and water from the disturbance of soils in land containing elevated contaminant levels.
•Construction activities with the potential to generate noise and vibration above permitted levels •Disturbance of contaminated soils •Vegetation Alteration, Removal and works within the protected root zone •Infrastructure that exceeds the permitted height standards •Earthworks within sites and places of significance to Mana Whenua, the Sediment Control Area and that exceeds 2500m2 and 2500m3 •Infrastructure works within areas subject to natural hazards and flooding.
Disturbance of material in the CMA, temporary diversion and damming of water in the CMA, construction of infrastructure in the CMA and the use and occupation of the CMA by the new marine outfall.
Dewatering and diversion of groundwater associated with the trenching and tunnelling.
Renovation of school sportsfield that contains elevated levels of lead contamination
To discharge contaminants to air from commercial fireworks displays.
To vary condition (1) of the Land Use LUC60379845-A to reflect proposed changes to a consented apartment building, including the exterior of the building, to reflect the detailed design of the facades
The construction of a 4 storey apartment with basement and associated earthworks on THAB zoned site.
Ministry for the Environment, National Monitoring System, July 2014 to June 2025. All resource consents
If it is yours, claiming it puts the council record, the title and what it costs you to hold in one place — and lets you put your lending, insurance and power out to people who compete for them.
We check your name against the registered owner on the title before a claim is accepted. Nothing on this page changes for anyone else, and no provider is contacted until you ask.
What the council's published maps say about this land. A map is a model of a storm, not a record of one: a LIM or a flood report says more.
Part of this property is inside a mapped flood area.
District plan zones as Auckland publishes them. What a site may be used for, and what may be built on it.
Land the council models as under water in a 1-in-100-year storm, usually with an allowance for climate change.
A low point where stormwater ponds if its outlet blocks or overflows.
Land beside a flood plain that could flood if the model is out, or the storm is bigger.
Land the sea reaches in a 1-in-100-year storm tide once sea level has risen by 1 m.
Streets whose built character is protected: demolition and new building are assessed against the area's existing form, whatever the zone allows.
A scheduled historic place. Work on it, including demolition, needs consent against the heritage schedule.
An explicit building height for this land, replacing the one its zone would give.
A protected view of a volcanic cone. Inside it, building height is capped at a fixed level above sea level to keep the cone visible.
A locally protected view of a cone, with its own height ceiling.
The protected view of the Auckland War Memorial Museum.
Skyline land where building height is controlled so the ridge stays a ridge.
A scheduled tree. It may not be felled or topped without consent, which makes it a permanent part of the skyline.
A scheduled stand of trees, protected as a group.
Local rules written for this area alone, which override the underlying zone where they differ.
Source: Auckland Council (CC BY 4.0)
Counts describe the records we hold for this territorial authority, not a market forecast. OwnBetter has no estimate for this property. Every council figure on this page can be checked against the council's own record.
People whose office is within 5 km of Westhaven, nearest first. Taken from the REA public register -- not ranked by sales, and nobody pays to appear here.
Land and title information sourced from Toitū Te Whenua Land Information New Zealand. Rating valuations from the relevant territorial authority. No ownership or mortgage information is published on this page.
A single search across NZ property records finds other titles in your name and in companies you are a director of. Most owners find at least one they had forgotten was held somewhere else.