Building consents
Building consents in Newmarket
Below: 6 consents we hold in Newmarket, searchable and on the map.
Consents on record in Newmarket
Individual building consents we hold, each on its property: 6 from 1 Apr 2021 to 1 Sep 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $40k
- Decks, pergolas and verandahs1
typically $50k
- Repairs, recladding and strengthening1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
6 consents
- Alterations and additions$20k
Alterations to existing bathrm & ensuite, new fixtures & fittings. Bath in bathrm replaced with tiled shower, new wall & f loor tiles. New tiled shower in ensuite, wall & floor tiles.
- Alterations and additions$50k
Rbw -demolition of existing kitchen, bathrm, laundry. Construction of new kitchen, bathrm, laundry, upstairs ensuite, relocate hot water cupboard. New drainage, waterproof membrane, timber framed
- Repairs, recladding and strengthening$200k
Amendment to bco10361653-c: repair & upgrade of existing roof structure, including new fall-arrest system. Note: this application concerns structure only & does not include any changes to the roof
- Decks, pergolas and verandahs$50k
Amendment - structural & fire stop repairs to balcony slab joints.
- Alterations and additions$40k
internal alterations to existing bathrm & laundry with new tiled shower. New walk in wardrobe
- Alterations and additions$50k
Rbw - 1. Move internal apartment entry door within same frr wall. 2. New ensuite (plumbing fixtures: wc, shower, whb), with associated plumbing & drainage.3. Replace external aluminium window & door glazed units (northwest side only)
ResidentialCommercial The dots are this page of the list.
Near Newmarket
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.