Building consents

Residential building consents in Ōhaeawai

Below: 105 residential consents we hold in Ōhaeawai, searchable and on the map.

Consents we hold10514 in the last 12 monthsSearch them ↓

Residential consents on record in Ōhaeawai

Individual building consents we hold, each on its property: 105 from 19 Oct 1993 to 13 Oct 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. New homes13

    9 in the last 12 months · typically $583k

  2. Plumbing, drainage and wastewater6

    3 in the last 12 months · typically $26k

  3. Garages, sheds and carports6

    1 in the last 12 months · typically $29k

  4. Fires and heating5

    typically $5,000

  5. Alterations and additions3

    1 in the last 12 months · typically $4,001

  6. Demolition1

    typically $150k

  7. Decks, pergolas and verandahs1
  8. Relocated buildings1

    typically $200k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 1April 2024: 1May 2024: 1June 2024: 1July 2024: 0August 2024: 1September 2024: 0October 2024: 1November 2024: 0December 2024: 0January 2025: 1February 2025: 0March 2025: 1April 2025: 0May 2025: 0June 2025: 1July 2025: 0August 2025: 0September 2025: 0October 2025: 2November 2025: 1December 2025: 2January 2026: 2February 2026: 5March 2026: 1April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 1September 2026: 1October 2026: 1

Largest in the last 12 months

  1. $756kConstruct new 4-bdrm dwg with attached dbl gge detached dwgs 103 State Highway 1
  2. $734kNew 3 bdrm dwg with attached dbl gge. Detached dwgs 103 State Highway 1
  3. $696kNew 3 bdrm dwg with dbl gge to be constructed detached dwg. 103 State Highway 1
  4. $616kConstruct a new 4 bdrm dwg with attached dbl detached dwgs 103 State Highway 1
  5. $583kConstruct new 3-bdrm dwg with attached dbl gge detached dwgs 103 State Highway 1

105 consents

  1. Plumbing, drainage and wastewater

    Proposed 3-bedroom dwelling with onsite wastewater system

    40B State Highway 1 · 13 Oct 2026 · EBC-2027-290/0

  2. Garages, sheds and carports

    Totalspan propose to build a Gable Range Garage and a Mono Range Carport

    8 Hobson Street · 11 Sep 2026 · EBC-2027-209/0

  3. Alterations and additions

    PIM Only - Relocated 2 Bedroom, weatherboard clad dwelling, replacing existing dwelling lost to fire. Garage

    38 Remuera Settlement Road · 5 Aug 2026 · EBC-2027-57/0

  4. Plumbing, drainage and wastewater$33k

    New onsite wastewater management system

    665 State Highway 1 · 1 Mar 2026 · EBC-2026-656/0

  5. New homes$474k

    3 bdrm dwg with attached single gge as part of detached dwgs

    103 State Highway 1 · 1 Feb 2026 · 25/0663

  6. New homes$549k

    3 bdrm dwg with attached dbl gge as part of detached dwgs

    103 State Highway 1 · 1 Feb 2026 · 25/0709

  7. New homes$616k

    Construct a new 4 bdrm dwg with attached dbl detached dwgs

    103 State Highway 1 · 1 Feb 2026 · 25/0804

  8. New homes$756k

    Construct new 4-bdrm dwg with attached dbl gge detached dwgs

    103 State Highway 1 · 1 Feb 2026 · 25/0824

  9. New homes$583k

    Construct new 3-bdrm dwg with attached dbl gge detached dwgs

    103 State Highway 1 · 1 Feb 2026 · 25/0825

  10. Plumbing, drainage and wastewater

    Proposed 5-bedroom dwelling with onsite wastewater system

    40A State Highway 1 · 19 Jan 2026 · EBC-2026-518/0

  11. New homes$430k

    New 3-bdrm dwg with attached single gge as part detached dwgs

    103 State Highway 1 · 1 Jan 2026 · 25/0385

  12. New homes$734k

    New 3 bdrm dwg with attached dbl gge. Detached dwgs

    103 State Highway 1 · 1 Dec 2025 · 25/0346

  13. New homes$468k

    New 3-bdrm dwg with attached single gge as part detached dwgs

    103 State Highway 1 · 1 Dec 2025 · 25/0581

  14. New homes$696k

    New 3 bdrm dwg with dbl gge to be constructed detached dwg.

    103 State Highway 1 · 1 Nov 2025 · 25/0308

  15. Fires and heating$7,500

    Kent Rata insert fire

    474 State Highway 1 · 1 Oct 2025 · 99954

  16. Fires and heating$5,000

    Replace solid fuel heater - metro eco wee rad on base.

    41 State Highway 1 · 1 Oct 2025 · ABA20250842

  17. New homes$1.2m

    Construction of dwg & pool fencing

    6074 State Highway 12 · 1 Jun 2025 · 2025/51806

  18. Alterations and additions$1

    Amendment 1 - update fire documents for alarm interface & access control

    17 Te Mania Drive · 1 Mar 2025 · BCN/2024/298/A

  19. Plumbing, drainage and wastewater$26k

    Replacement onsite wastewater syste

    20 Remuera Settlement Road · 1 Jan 2025 · EBC-2025-571/0

  20. New homes$200k

    Construct a minor dwg at the rear of a site that contains an existing dwg

    24 State Highway 1 · 1 Oct 2024 · 240311

  21. Garages, sheds and carports

    Construct a Versatile 600 Series Garage

    13 Tennyson Street · 29 Aug 2024 · EBC-2025-156/0

  22. Relocated buildings$200k

    Foundations & services for relocatable dwg

    60 Showground Road · 1 Jun 2024 · 98687

  23. Fires and heating

    Install of a Metro Smart Insert Woodburning (Clean Air), Flue and Chimney Plate

    5982 State Highway 12 · 20 May 2024 · EBC-2024-986/0

  24. New homes$1m

    RBW - housing (detached dwg) - new 4 bdrm dwg with attached gge

    12 Tennyson Street · 1 Apr 2024 · BC240053

  25. Alterations and additions$8,000

    Installation of jayline fr400 rural

    444C State Highway 1 · 25 Mar 2024 · EBC-2024-819/0

ResidentialCommercial The dots are this page of the list.

Near Ōhaeawai

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.