Building consents
Commercial building consents in Leigh
Below: 5 commercial consents we hold in Leigh, searchable and on the map.
Commercial consents on record in Leigh
Individual building consents we hold, each on its property: 5 from 1 Sep 2019 to 1 Feb 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
typically $185k
- New commercial buildings1
typically $850k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
5 consents
- Commercial alterations$250k
Rbw - proposed add to existing first floor area, including new sitting room, store, library & covered deck, existing roofing to be replaced.
- New commercial buildings$850k
Rbw - new 2 storey dwg, including 3 bedrooms, an office, 2 bathrooms, a lounge/kitchen, a laundry, a toilet & a dbl gge. Add to the existing masonry rtw to north & south. Installation of new watertanks
- Commercial alterations$120k
Rbw - construct a 15m2 add to add an ensuite to the master bdrm. The bathrm will be relocated in the current gge with an office. The laundry will be relocated to the basement. Gge area reduced to meet coverage restriction.
- Commercial alterations$70k
Owner builder -rbw - construction to provide an office space within the existing footprint of the house - 8m2 extension se - side. Solid fuel heater - warmington woodburner.
- Commercial alterations$80k
constructed versatile 600 series home office, 12.6m x 5m x 2.4m stud height
ResidentialCommercial The dots are this page of the list.
Suburbs in Leigh
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.