Mount Roskill, Auckland · Auckland
From the council’s rating records and the other sources noted on hover. Bedrooms and bathrooms may come from a past listing. Built is the decade the valuer records.
Owners and the parties to each instrument are not published on this page. Order the record of title to see them.
Selling this property, or the agent for it? Import the listing from your agency's site or a portal and it appears here, free: photos, price, open homes and your details, beside the council record buyers are already reading.
We hold no building consents for this property yet. The council may hold records we have not seen.
What the council has been asked to allow under the Resource Management Act. 3 on this property · 16 land use or subdivision consents within 250 m.
The construction of a bore to enable the taking of groundwater from the Auckland Isthmus Waitemata Aquifer for amenity irrigation within the Murry Hallberg Retirement Village, Hillsborough..
This application is to drill an additional bore at the Murray Halberg Comprehensive Care Retirement Village and change the condition s of consent R LUC 2016 1968 R REG 2016 1969 and REG 2016 1970 to enable the existing water take to be split across the consented bo re and additional bore, as part of the development of the retirement village to be used as part of the on site irrigation. It is to be noted that the daily and annual totals are the combined totals for the site.
Section 127 to make amendments to the design of the fencing on the eastern boundary of the Site via the installation of a new pedestrian gate onto Commodore Drive. Additionally, it is proposed for there to be a new pedestrian path and memorial garden near the eastern boundary of the Site, as well as a footpath extension which will connect the Village to the gate.
FFL of the dwellings being lifted from FFL34.05 to FFL34.50 to accommodate the required cover over the WW line. This results in a ch ange to the maneuvering area and removal of the safety platform to
FFL of the dwellings being lifted from FFL34.05 to FFL34.50 to accommodate the required cover over the WW line. This results in a ch ange to the maneuvering area and removal of the safety platform to
To demolish all existing development and remove existing underground fuel tanks then establish a new ‘self service’ Service Station to operate 24 7 with associated site works, including discharge of contaminants to the environment from earthworks during construction.
Construction of five new attached dwellings followed by fee simple subdivision around approved land use development.
Construction of five new attached dwellings followed by fee simple subdivision around approved land use development.
Ministry for the Environment, National Monitoring System, July 2014 to June 2025. All resource consents
If it is yours, claiming it puts the council record, the title and what it costs you to hold in one place — and lets you put your lending, insurance and power out to people who compete for them.
We check your name against the registered owner on the title before a claim is accepted. Nothing on this page changes for anyone else, and no provider is contacted until you ask.
What the council's published maps say about this land. A map is a model of a storm, not a record of one: a LIM or a flood report says more.
Part of this property is inside a mapped flood area.
District plan zones as Auckland publishes them. What a site may be used for, and what may be built on it.
Land the council models as under water in a 1-in-100-year storm, usually with an allowance for climate change.
A low point where stormwater ponds if its outlet blocks or overflows.
Land beside a flood plain that could flood if the model is out, or the storm is bigger.
Land the sea reaches in a 1-in-100-year storm tide once sea level has risen by 1 m.
Streets whose built character is protected: demolition and new building are assessed against the area's existing form, whatever the zone allows.
A scheduled historic place. Work on it, including demolition, needs consent against the heritage schedule.
An explicit building height for this land, replacing the one its zone would give.
A protected view of a volcanic cone. Inside it, building height is capped at a fixed level above sea level to keep the cone visible.
A locally protected view of a cone, with its own height ceiling.
The protected view of the Auckland War Memorial Museum.
Skyline land where building height is controlled so the ridge stays a ridge.
A scheduled tree. It may not be felled or topped without consent, which makes it a permanent part of the skyline.
A scheduled stand of trees, protected as a group.
Local rules written for this area alone, which override the underlying zone where they differ.
Source: Auckland Council (CC BY 4.0)
Counts describe the records we hold for this territorial authority, not a market forecast. OwnBetter has no estimate for this property. Every council figure on this page can be checked against the council's own record.
People whose office is within 5 km of Mount Roskill, nearest first. Taken from the REA public register -- not ranked by sales, and nobody pays to appear here.
Land and title information sourced from Toitū Te Whenua Land Information New Zealand. Rating valuations from the relevant territorial authority. No ownership or mortgage information is published on this page.
A single search across NZ property records finds other titles in your name and in companies you are a director of. Most owners find at least one they had forgotten was held somewhere else.