

Whangaparāoa · Auckland
From LINZ's topographic maps: how near the land comes to the water's edge.
The council's capital value of 32 East Point is $2,300,000 as at 1 May 2024: land $1,100,000 and improvements $1,200,000.
From the council’s rating records and the other sources noted on hover. Bedrooms and bathrooms may come from a past listing. Built is the decade the valuer records.
Owners and the parties to each instrument are not published on this page. Order the record of title to see them.
Selling this property, or the agent for it? Import the listing from your agency's site or a portal and it appears here, free: photos, price, open homes and your details, beside the council record buyers are already reading.
We hold no building consents for this property yet. The council may hold records we have not seen.
What the council has been asked to allow under the Resource Management Act. 3 on this property · 10 land use or subdivision consents within 250 m. 1 here is worth reading: declined, notified or not yet decided.
Consent to erect a household unit which infringes the height in relation to boundary development control and performance standard. The associated earthworks exceed the permitted area of earthworks in the Proposed Auckland Unitary Plan and will infringe the 1 vertical to 2 horizontal development control.
Consent to construct a new two level dwelling involving earthworks over an area of 538.5m² and with a volume of 508m³.
Consent to establish a residential dwelling and accessory building and retaining structures with a maximum height of 2.5m within the 3m yards, and to undertake 1528.2m³ of earthworks over 1312m² which will infringe the earthworks to boundary control.
To convert the existing minor dwelling to a principal dwelling, which will result in two principal dwellings being located on the site.
the subject site consist of two existing detached dwellings, which were established as a cross leased site around 1987.
To construct a dwelling and minor dwelling on the subject site that requires consent for being within the 1% Annual Exceedance Probability (AEP) floodplain.
A combined consent to undertake a 2-stage land use and subdivision consent. Land use consent is required to convert the existing minor dwelling to a secondary dwelling, then as part of stage 2 subdivide around the two existing dwellings
A combined consent to undertake a 2-stage land use and subdivision consent. Land use consent is required to convert the existing minor dwelling to a secondary dwelling, then as part of stage 2 subdivide around the two existing dwellings
Consent to subdivide the parent site of less than 1 hectare into two lots in a residential zone around an existing building and involving a vacant site less than 600m2, with an associated access that does not comply with the gradient of vehicle access standard.
Ministry for the Environment, National Monitoring System, July 2014 to June 2025. All resource consents
If it is yours, claiming it puts the council record, the title and what it costs you to hold in one place — and lets you put your lending, insurance and power out to people who compete for them.
We check your name against the registered owner on the title before a claim is accepted. Nothing on this page changes for anyone else, and no provider is contacted until you ask.
What the council's published maps say about this land. A map is a model of a storm, not a record of one: a LIM or a flood report says more.
Part of this property is inside a mapped flood area.
District plan zones as Auckland publishes them. What a site may be used for, and what may be built on it.
Land the council models as under water in a 1-in-100-year storm, usually with an allowance for climate change.
A low point where stormwater ponds if its outlet blocks or overflows.
Land beside a flood plain that could flood if the model is out, or the storm is bigger.
Land the sea reaches in a 1-in-100-year storm tide once sea level has risen by 1 m.
Streets whose built character is protected: demolition and new building are assessed against the area's existing form, whatever the zone allows.
A scheduled historic place. Work on it, including demolition, needs consent against the heritage schedule.
An explicit building height for this land, replacing the one its zone would give.
A protected view of a volcanic cone. Inside it, building height is capped at a fixed level above sea level to keep the cone visible.
A locally protected view of a cone, with its own height ceiling.
The protected view of the Auckland War Memorial Museum.
Skyline land where building height is controlled so the ridge stays a ridge.
A scheduled tree. It may not be felled or topped without consent, which makes it a permanent part of the skyline.
A scheduled stand of trees, protected as a group.
Local rules written for this area alone, which override the underlying zone where they differ.
Source: Auckland Council (CC BY 4.0)
Councils keep registers of land used for activities on the Hazardous Activities and Industries List (HAIL) — service stations, timber treatment, orchards, landfills. A listing records how land was used, not that it is contaminated: most sites have never been tested.
Auckland Council does not publish its contaminated sites records. A site contamination enquiry (a fee applies) or the LIM will say what it holds.
Ask Auckland Council7 people looked at properties in Manly this week.
Counts describe the records we hold for this territorial authority, not a market forecast. OwnBetter has no estimate for this property. Every council figure on this page can be checked against the council's own record.


















People whose office is within 5 km of Manly, nearest first. Taken from the REA public register -- not ranked by sales, and nobody pays to appear here.
A single search across NZ property records finds other titles in your name and in companies you are a director of. Most owners find at least one they had forgotten was held somewhere else.