Building consents
Residential building consents in Ahaura
Below: 13 residential consents we hold in Ahaura, searchable and on the map.
Residential consents on record in Ahaura
Individual building consents we hold, each on its property: 13 from 1 May 2020 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating6
2 in the last 12 months · typically $7,000
- Alterations and additions3
typically $52k
- Plumbing, drainage and wastewater1
typically $4,000
- New homes1
typically $4m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $10kReplacement of multifuel space heater 1 Arnould Street, Ahaura
- $10kRemove old fire, install new woodsman coaster. 69 Granville Road, Totara Flat
13 consents
- Fires and heating$10k
Replacement of multifuel space heater
- Fires and heating$10k
Remove old fire, install new woodsman coaster.
- Fires and heating$8,000
Install woodsman coaster multifuel fire with wetback
- Fires and heating$5,000
Fire & flue installation
- Alterations and additions$52k
New bathrm for disabled access, new kitchen design for disable access, other internal modifications, new heat pump
- Alterations and additions$280k
Existing dwg raised above q100 level 2x additions & detached dwgs
- New homes$4m
Rbw pbc e2e 14x new 2 storey dwgs. Lot 1 with 3 bedrooms & 1.5 bathrooms lot 2 14 each with 2 bedrooms & 1.5 bathrooms. New retaining walls & soakhole
- Fires and heating$5,000
Second hand Woodsman Strongman fire with new flue & two new windows to lounge area.
- Plumbing, drainage and wastewater$4,000
Toilet ablution block (proposed lot 2)
- Alterations and additions$6,000
New kronos multifuel installation
- Fires and heating$6,000
Install new yunca monte fire
- Garages, sheds and carports$79k
Construct an ideal gge outbuildings
- Fires and heating$6,500
Install new wetback woodsman strongman heater
ResidentialCommercial The dots are this page of the list.
Suburbs in Ahaura
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.