Building consents

Building consents in Auckland Central

Below: 23 consents we hold in Auckland Central, searchable and on the map.

Consents we hold233 in the last 12 monthsSearch them ↓

Consents on record in Auckland Central

Individual building consents we hold, each on its property: 23 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions10

    2 in the last 12 months · typically $19k

  2. Decks, pergolas and verandahs2

    typically $25k

  3. Fires and heating1

    1 in the last 12 months · typically $7,000

  4. Repairs, recladding and strengthening1

    typically $25k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 1June 2024: 0July 2024: 0August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 1January 2025: 0February 2025: 1March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 1January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 1June 2026: 0July 2026: 0August 2026: 1September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $19kRbw - internal renovations to existing bathrm. New fixtures, tiles & waterproofing 3B/6 Fisher-Point Drive
  2. $15kBathrm to be waterproofed, re-tiled & fittings replaced. 1I/22 Pakenham Street East
  3. $7,000Replacing existing solid fuel heater with a new masport kronos multi fuel, with existing wetback 1-7 Brickfield Way

23 consents

  1. Alterations and additions$15k

    Bathrm to be waterproofed, re-tiled & fittings replaced.

    1I/22 Pakenham Street East · 1 Aug 2026 · BCO10415860

  2. Fires and heating$7,000

    Replacing existing solid fuel heater with a new masport kronos multi fuel, with existing wetback

    1-7 Brickfield Way · 1 May 2026 · BC260050

  3. Alterations and additions$19k

    Rbw - internal renovations to existing bathrm. New fixtures, tiles & waterproofing

    3B/6 Fisher-Point Drive · 1 Dec 2025 · BCO10404871

  4. Alterations and additions$19k

    Renovate existing bathrm. Replace shower over bath with tiled shower.

    GA/68 Greys Avenue · 1 Feb 2025 · BCO10391944

  5. Alterations and additions$78k

    Rbw - renovation of bathrm & re-gib one firewall as per plan

    602/8 Albert Street · 1 Dec 2024 · BCO10388118

  6. Alterations and additions$20k

    Bathrm renovation to existing bathrm

    1003/1 Hobson Street · 1 Sep 2024 · BCO10386710

  7. Alterations and additions$18k

    Dbc bathrm & laundry renovations to existing apartment with new waterproofing membrane & tiles.

    26/23 Graham Street · 1 May 2024 · BCO10381171

  8. Decks, pergolas and verandahs$25k

    Dbc - amendment - refurbishment to existing balcony deck area with new membrane & tiled deck on pedestals.

    5D/68 Greys Avenue · 1 Oct 2023 · BCO10361546-A

  9. Alterations and additions$15k

    Dbc -rbw - removing existing bath & replacing with new shower. New internal waterproofing & tiling to existing bathrm.

    15G/1 Emily Place · 1 Oct 2023 · BCO10372386

  10. Alterations and additions$5,000

    unit 8e- change the bath to shower, add a raised shower plat form

    8E/1 Emily Place · 1 Jul 2023 · BCO10369769

  11. Alterations and additions$50k

    minor alterations within the existing apartment to include replacing showers & floor tiles to two bathrooms & minor adjustments to plumbing fittings.

    1/39 Pitt Street · 1 Feb 2023 · BCO10360496

  12. Alterations and additions$50k

    Rbw - proposed two-bdrm partial interior re-line of existing walls within unit d level six, bianco off queen building. This consent is to reinstate wall linings as per original including part intertenancy walls with new wall & ceiling insulation

    6D/8 White Street · 1 May 2022 · BCO10348546

  13. Decks, pergolas and verandahs$25k

    installation of a new window to the existing balcony opening. Minor interior refurbishments (not requiring consent)

    3B/14 Beaumont Street · 1 Apr 2022 · BCO10344534

  14. Repairs, recladding and strengthening$25k

    reclad - isolated remedial works to a section of cladding & framing below an existing joinery unit. Replacement of the framing & cladding with new. Removal of existing joinery unit to install flashings & reinstate joinery unit.

    2G/1 Emily Place · 1 Mar 2022 · BCO10338047

  15. Alterations and additions$75k

    Internal refurbishment of apartment comprising new kitchen, bathrm & laundry; bathrm waterproofing; fire stopping; replacement of non-fire rated plumbing shafts with fire rated shafts.

    1806/8 Albert Street · 1 Sep 2021 · BCO10334964

  16. Plumbing, drainage and wastewater$10k

    unit dd- new toilet & wash hand basin room for an apartment unit.

    68-70 Greys Avenue · 1 Aug 2021 · BCO10332067

  17. Alterations and additions$30k

    Rbw - internal remediation. Make good existing firewalls. New fire gib to steel portals. Make good existing & new penetrations in firewalls. Remove existing ceiling & replace with fireline gib

    8A/22 Emily Place · 1 Apr 2021 · BCO10312321

  18. Fit-outs$60k

    Rbw - interior fit out of an existing apartment, no load bearing structure, no external works. Includes new waterproofed shower & electric hwc.

    1G/22 Emily Place · 1 Apr 2021 · BCO10323116

  19. Plumbing, drainage and wastewater$5,000

    Add an additional toilet to the lower level of our property

    1-11 Fisher-Point Drive · 1 Sep 2020 · BCO10310194

  20. Alterations and additions$490k

    Replace existing carpet floor with t&g timber to all living areas; replace all carpet to bedrooms with new carpets; repaint & install vinyl wallcover to selected walls; replace all bathrm fittings & fixtures; main bathrm- replace bath w shower

    3301/1 Courthouse Lane · 1 Apr 2020 · BCO10301164

  21. Repairs, recladding and strengthening$15k

    amendment - rbw - reclad - additional cladding to the southern elevation.

    25 Fisher-Point Drive · 1 Feb 2020 · BCO10263179-A

  22. Alterations and additions$20k

    add of a new mezzanine level & new timber staircase

    18 Boardman Lane · 1 Oct 2019 · BCO10284854

  23. Repairs, recladding and strengthening$176k

    rbw - reclad - proposed remedial works to decks & full reclad.

    25 Fisher-Point Drive · 1 Aug 2019 · BCO10263179

ResidentialCommercial The dots are this page of the list.

Near Auckland Central

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Auckland Council.