Below: 157 consents we hold in Glendene, searchable and on the map.
Consents on record in Glendene
Individual building consents we hold, each on its property: 157 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions29
8 in the last 12 months · typically $20k
- New homes18
3 in the last 12 months · typically $464k
- Fires and heating10
2 in the last 12 months · typically $4,897
- Garages, sheds and carports10
1 in the last 12 months · typically $45k
- Decks, pergolas and verandahs6
1 in the last 12 months · typically $22k
- Insulation4
typically $3,150
- Multiple homes4
typically $1.8m
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $15k
- Repairs, recladding and strengthening3
1 in the last 12 months · typically $95k
- Minor dwellings and sleepouts2
typically $526k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.1mRbw - proposed 5x2 storey dwgs (lot 1 & lot2 standalone, lot3-5 terraced). Lot1-3 with 4 bedrooms, 2 bathrooms, 1 wc & single gge. Lot4-5 with 3 bedrooms, 2 bathrooms, 1 wc & single gar 8 Jenelin Road
- $990kRbw - construction of 1 detached 2 storey house, driveway & earthworks. Ground fl: living, dining, kitchen, scullery, bdrm & bathrm, dbl gge & ldy, wc. First fl: 4 bedrooms, 3 bathroo 43 Farquhar Road
- $500kRbw - construction of single storey detached dwg comprising four bedrooms, bathrooms, dbl internal gge living, kitchen & dining. Relocation of the existing. 125 Farquhar Road
- $380kRbw - proposed repair & redesign of existing fire damaged building on ground floor only. 62A Glendene Avenue
- $350kRbw - renovation & extension to alt the existing house into a four bdrm & two-bathrm dwg. 85 Farquhar Road
157 consents
- New homes$990k
Rbw - construction of 1 detached 2 storey house, driveway & earthworks. Ground fl: living, dining, kitchen, scullery, bdrm & bathrm, dbl gge & ldy, wc. First fl: 4 bedrooms, 3 bathroo
- Garages, sheds and carports$20k
Rbw - conversion of existing gge into two new bedrooms. Upgrade existing kitchen & existing bathrm. Add of ensuite into a bdrm.
- Alterations and additions$220k
Rbw - floor plan changes for dbl storey dwg kitchen on ground floor, total 4 bedrooms, 3 bath renovated, laundry,
- Fires and heating$6,500
Installation of new masport r1200 woodfire
- New homes$500k
Rbw - construction of single storey detached dwg comprising four bedrooms, bathrooms, dbl internal gge living, kitchen & dining. Relocation of the existing.
- Repairs, recladding and strengthening$380k
Rbw - proposed repair & redesign of existing fire damaged building on ground floor only.
- Alterations and additions$19k
Rbw - internal renovation to add a new bathrm, kitchenette & additional shower to the existing toilet.
- Alterations and additions$2,000
New wc into existing bathrm
- Alterations and additions$4,800
Rbw - new bathrm add to the existing dwg
- Fires and heating$6,000
Install metro wee rad leg ca freestanding wood fire
- Alterations and additions$5,000
Rbw. Amendment to bco10406313. Amendment to change roof cladding from monier concrete tiles to longrun diamond styleline roofing & to change flooring in the renovation area from ecoply to laminex St
- Plumbing, drainage and wastewater$18k
Rbw - renovation an existing bathrm. No framing changes, no new drainage work.
- Decks, pergolas and verandahs$15k
7.5m x 4.5m timber slatted deck with timber balustrade
- Alterations and additions$20k
Rbw - changing existing laundry into a bathrm, & adding a new bathrm, laundry into an existing gge.
- Alterations and additions$350k
Rbw - renovation & extension to alt the existing house into a four bdrm & two-bathrm dwg.
- Alterations and additions$7,500
Rbw spouting changed to internal gutter, barge changed to parapet & apron flashing, trusses changed to rafters, window added to gge, joists changed from 190 to 140mm
- New homes$2.1m
Rbw - proposed 5x2 storey dwgs (lot 1 & lot2 standalone, lot3-5 terraced). Lot1-3 with 4 bedrooms, 2 bathrooms, 1 wc & single gge. Lot4-5 with 3 bedrooms, 2 bathrooms, 1 wc & single gar
- New homes$1.7m
Rbw - prop. Lot1&2, two storey house, 4 bed, 2 bath, 1 wc,1 single gge. Lot 3, two storey house, 3 bed, 2 bath, 1 wc, 1 single gge. Lot 4, two storey house, 4 bed, 3 bath, 1 wc, 1 single gge.
- Multiple homes$2.3m
Rbw - construction of five two-storey detached dwgs, each comprising four bedrooms, 3.5 bathrooms, sitting room, study, single internal gge. Included stormwater tank, retaining walls.
- New homes$1.3m
Rbw - relocation of existing unit to the rear of lot. Proposed foundation, deck & ext. Staircase. Proposed unit at the front consisting of dbl gge, decks, living, dining, kitchen, four bedroom
- New homes$490k
Rbw - to constuct a new 2 storied res dwg with 3 bedrooms, a study, a separate lounge, a kitchen dining & lounge, 2 bathrooms + ensuite, an upper deck & dbl gge.
- New homes$319k
Rbw - 2 storey dwg, 3 bedrooms, 2 bathrooms, lounge, dining, kitchen laundry with gge. Storm water tank provided. & fire walls & fire ceilings.
- Alterations and additions$25k
Rbw - amendment to bco10366044- changes to southern block wall on boundary, internal wall changes to gge, additional concrete piles added to foundations, drainage layout changed, letterbox added to
- Alterations and additions$15k
Rbw - internal alterations to renovate bathrm & laundry
- Alterations and additions$30k
Rbw - replacement of original concrete tile roof with new profiled metal roof.
ResidentialCommercial The dots are this page of the list.
Near Glendene
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.