Building consents
Commercial building consents in Point Chevalier
Below: 14 commercial consents we hold in Point Chevalier, searchable and on the map.
Commercial consents on record in Point Chevalier
Individual building consents we hold, each on its property: 14 from 1 Sep 2019 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New commercial buildings4
1 in the last 12 months · typically $1m
- Commercial alterations4
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $450kRbw - raising existing single level dwg to two storey dwg, three bedrooms, office, two lounge, dining & kitchen with scullery, wc, two bathrm, solid fuel heater & swimming pool. 18 Formby Avenue
14 consents
- New commercial buildings$450k
Rbw - raising existing single level dwg to two storey dwg, three bedrooms, office, two lounge, dining & kitchen with scullery, wc, two bathrm, solid fuel heater & swimming pool.
- New commercial buildings$800k
Rbw - demolish existing house & gge. Build new single level main house at back yard, with 3 bedrooms 3 & half bathrm, multi living area. New 2 storey dbl gge proposed with home office a
- Commercial alterations$400k
Rbw - existing detached gge to be demolished. New extension at the back of existing house, new kitchen, living, laundry, bathrm media room, office. Existing living into bdrm 3, ensuite & war
- Commercial alterations$150k
Rbw - internal alterations including new beams to open up lounge, reposition kitchen, upgrade bathrm & install new ensuite. Reposition laundry to hall cupboard. Install new windows & door as noted
- Commercial alterations$25k
Rbw - minor alterations to existing two storey dwg including three new doors, conversion of existing gge to an office & a new storage loft above the new office.
- New commercial buildings$1.5m
Rbw - new two-storey dwg, with two bedrooms, one master bdrm with ensuite & walk in wardrobe, one crafts room, one office, one meeting room, two bathrooms, one media room, one living kitchen dining room, solid fuel heater, one dbl gge
- Commercial alterations$250k
Rbw- new pool house with bathrm, sauna & an attached office. New pool fence to form immediate pool area.
- New commercial buildings$1.2m
Rbw - remove existing dwg. New dbl storey dwg, 4 bdrm, 1 office, 1 living room, 3 bath/ensuite with dbl internal gge.
- Commercial alterations$450k
Rbw - renovation of existing res dwg including a new storage room next to gge, reconfiguration of ground floor layout to convert 1) guest suite to a lounge, 2) bdrm, office & utility room to kitchen, dining & living area, recon
- Commercial alterations$65k
Proposed replacement building. 9.0x6.0 gge office storage building
- Commercial alterations$50k
Rbw - amendment - timber floor structure to new weatherboard clad living pavilion.
- Commercial alterations$100k
Rbw - small extension of extg. Porch to accommodate new ensuite & laundry.Upgrade of openings to extg deck. Internal alterations to create open plan kitchen & lounge.Integrate new office & shift bathrm to suit.
- Commercial alterations$180k
rbw - internal alterations to lower level. Ex roof enclosure to be removed & enclosed to add to ex. Lounge area. Only new porch area added to ex. Footprint. Proposed upper level added to include bdrm 4 & office space.
- Commercial alterations$150k
rbw - demolish existing gge.New accessory building with rumpus, office & bathrm
ResidentialCommercial The dots are this page of the list.
Near Point Chevalier
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.