Building consents
Building consents in Point England
Below: 111 consents we hold in Point England, searchable and on the map.
Consents on record in Point England
Individual building consents we hold, each on its property: 111 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Multiple homes66
6 in the last 12 months · typically $602k
- New homes22
8 in the last 12 months · typically $707k
- Alterations and additions7
3 in the last 12 months · typically $65k
- Fires and heating2
1 in the last 12 months · typically $5,000
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $20k
- Fit-outs1
typically $1.3m
- Decks, pergolas and verandahs1
typically $80k
- Pools and spas1
typically $50k
- Relocated buildings1
typically $55k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $4.7mBlock a - new three-storey apartment building (15 units). Two-bdrm, one bathrm, laundry & kitchen (per unit). Associated structure, envelope, services, private drainage with the apartment. Pass 2 Tuakiri Street
- $3.8mRbw- pbc e2e: 15x new 2 storey dwgs. Lots 1-8 & lots 13-15 each with 3 bedrooms & 1.5 bathrooms; lots 9-12 each with 2 bedrooms & 1.5 bathrooms. New retaining walls 59 Torino Street
- $3.3mNew three-storey apartment (9 units) each unit has two bedrooms with one bathrm, separate laundry, a kitchen & exterior balcony . Associated structure, envelope, services, private drainage, hards 198 Pilkington Road
- $2.6mRbw - block a lots 5-9 - first of 3 no. Building consents across 1 taukana & 26-30 taratoa streets. Block a comprises 2x 4-bdrm, 2 bath & 3 by 5 -bdrm, 3 bath 2-storey, brick & fibre-cemen 30 Taratoa Street
- $2.2mRbw - first of 4 building consents across 38-44 torino St. Block d comprises of 4x2 storey attached res units with 5-bedrooms, 3.5 bathrooms, & attached single gge. 44 Torino Street
111 consents
- Multiple homes$3.3m
New three-storey apartment (9 units) each unit has two bedrooms with one bathrm, separate laundry, a kitchen & exterior balcony . Associated structure, envelope, services, private drainage, hards
- Multiple homes$1.5m
Rbw - construction of four new dwgs comprising one duplex unit (2 units) & 2 stand alone houses. Lot 1 comprising 4 bed, 3.5 bath, study single gge, kitchen, living & dining. Lot 2-4 consi
- Alterations and additions$30k
Internal alterations to existing flat 1 single storey dwg - comprising alt of existing bathrm & wc.
- Multiple homes$1m
Rbw - stage.3 of 3, apartment superstructure building consent for lots.6, 6a-6d construction of one three-storey walk-up apartment block comprising four units (one 2-bdrm unit & three 1-bdrm u
- Alterations and additions$8,627
Installation of a new firenzo contessa wetbacked platform
- New homes$3.8m
Rbw- pbc e2e: 15x new 2 storey dwgs. Lots 1-8 & lots 13-15 each with 3 bedrooms & 1.5 bathrooms; lots 9-12 each with 2 bedrooms & 1.5 bathrooms. New retaining walls
- Multiple homes$1.2m
Rbw - stage.2 of 3, terrace house superstructure building consent for lots.1-5 construction of five two-storey terraced dwgs, each comprising 2 bedrooms, 2 bathrooms, & 1 carport. Scope include
- New homes$1.3m
Rbw - block c, lots 10-12 - last of 3 no. Building consents across 1 taukana & 26-30 taratoa streets. Block c comprises 3x 4-bdrm, 2 bath 2-storey, brick clad res dwgs.
- New homes$2m
Rbw- second of 3 no. Building consents across 1 taukana & 26-30 taratoa streets. Block b comprises four 4-bdrm, two bath 2-storey, brick & fibre-cement weatherboard clad res dwgs,
- Plumbing, drainage and wastewater$20k
Rbw - final approved epa saw the private stormwater drainage line moving closer to block a building & decks. This amendment application is for the changes to the structural bridging & foundation s
- Multiple homes$4.7m
Block a - new three-storey apartment building (15 units). Two-bdrm, one bathrm, laundry & kitchen (per unit). Associated structure, envelope, services, private drainage with the apartment. Pass
- New homes$2.6m
Rbw - block a lots 5-9 - first of 3 no. Building consents across 1 taukana & 26-30 taratoa streets. Block a comprises 2x 4-bdrm, 2 bath & 3 by 5 -bdrm, 3 bath 2-storey, brick & fibre-cemen
- Multiple homes$1.9m
Rbw - lots 1-3: three detached dwgs of two-stories each with four bedrooms, two bathrooms, & one wc, & one attached dbl gge. Aquacombs pods stormwater detention tanks under waffle slab
- Alterations and additions$900k
Rbw - extension to family home - new 88sqm containing one bdrm, bathrm, laundry & kitchen living space. Attached to the existing home.
- Fires and heating$6,000
woodsman Tasman freestanding fire
- New homes$2.2m
Rbw - first of 4 building consents across 38-44 torino St. Block d comprises of 4x2 storey attached res units with 5-bedrooms, 3.5 bathrooms, & attached single gge.
- New homes$1.2m
Rbw - second of 4 building consents across 38-44 torino St. Block a comprises 2x 5-bdrm, 3.5 bathrm, two-storey res dwgs, each with attached single gge.
- New homes$1m
Rbw - last of four building consents across 38-44 torino St. Block b comprises of 2x 4-bdrm, 3.5 bathrm, two-storey res dwgs
- New homes$1.2m
Rbw - third of 4 no. Building consents across 38-44 torino St. Block c comprises 2x five bedrooms, 3.5 bathrooms, two-storey res dwgs, each with attached gge.
- Alterations and additions$65k
Rbw - reinstatement of internal lining, framing, cladding & roofing due to fire damage, new timber balustrade.
- Multiple homes$1.4m
Rbw - two new three-storey units, lots 1 & 2. Gge, laundry, & bed with ensuite on ground floor. Kitchen, dining, living, toilet on first floor. Master & bed with ensuites on second floor. Sit
- Multiple homes$1.6m
Rbw - five new two-storey units, lots 3-7. Living, dining, kitchen, toilet, & laundry on ground floor. Two beds & bath on first floor. Stormwater tank, private drainage & retaining wall.
- New homes$746k
Rbw - three level dwg containing three bedrooms & shared bathrm at basement, ground level with kitchen, dining, living, one bdrm, one bathrm, laundry & single int access gge. Upper lev
- Multiple homes$1.6m
Rbw - block b - new two-storey terrace building (six units). Three-bdrm, one bathrm, wc, laundry & kitchen (per unit). Associ ated structure, envelope, services, private drainage & in-slab aq
- Multiple homes$600k
Rbw - block c - new two-storey duplex building (two units). Three-bdrm, one bathrm, wc, laundry & kitchen (per unit). Associa ted structure, envelope, services, private drainage & below groun
ResidentialCommercial The dots are this page of the list.
Near Point England
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.