Building consents
Building consents in Redvale
Below: 42 consents we hold in Redvale, searchable and on the map.
Consents on record in Redvale
Individual building consents we hold, each on its property: 42 from 1 Nov 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions6
2 in the last 12 months · typically $75k
- Retaining walls5
2 in the last 12 months · typically $150k
- New homes5
2 in the last 12 months · typically $1m
- Fires and heating5
typically $4,325
- Multiple homes3
3 in the last 12 months · typically $800k
- Pools and spas3
typically $80k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $480k
- Garages, sheds and carports1
1 in the last 12 months · typically $70k
- Decks, pergolas and verandahs1
typically $70k
- Commercial alterations1
typically $750k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.1mRbw - stage 3 of 6 construction of three duplex dwg type 2 off 3, as part of the weiti res development. 1080 East Coast Road
- $1.4mRbw - stage 4 of 6 construction of one quadplex dwg type 3 off 4, as part of the weiti res development. 1080 East Coast Road
- $1mRbw - new 1 storey dwg with attached gge & concrete pool. Timber framed walls & trusses. Concrete raft slab foundation. Profiled metal roofing. Brick veneer cladding & feature timber wbs 56 Awanohi Road
- $800kRbw - stage 2 of 6 - construction of one duplex dwg (type 1) with 2 bedrooms, 2 bathrooms & single gge. Proposed timber & keystone retaining wall 1080 East Coast Road
- $686kRbw - stage 5 of 6 - construction of one duplex dwg; type 4 off 5, as part of the weiti res development. 1080 East Coast Road
42 consents
- Retaining walls$100k
Replacement of the failed retaining wall with a steel uc retaining wall, including timber log railing & soil anchors, to support the common accessway.
- Multiple homes$686k
Rbw - stage 5 of 6 - construction of one duplex dwg; type 4 off 5, as part of the weiti res development.
- Multiple homes$2.1m
Rbw - stage 3 of 6 construction of three duplex dwg type 2 off 3, as part of the weiti res development.
- New homes$1.4m
Rbw - stage 4 of 6 construction of one quadplex dwg type 3 off 4, as part of the weiti res development.
- New homes$1m
Rbw - new 1 storey dwg with attached gge & concrete pool. Timber framed walls & trusses. Concrete raft slab foundation. Profiled metal roofing. Brick veneer cladding & feature timber wbs
- Alterations and additions$30k
Small extension to the master bdrm
- Alterations and additions$220k
Rbw - this project is part of C2P funding resulting from flooding in the past. Flood reports & proposal have been submitted through the portal process. New piles & bearers. Veranda deck & ro
- Retaining walls$300k
Slip remediation - proposed in-ground palisade retaining wall & replacement of existing tprw adj to existing carport (incl removal existing carport attached to existing tprw, new dispersal device fo
- Garages, sheds and carports$70k
Construction of 6.6 x 9 gge
- Multiple homes$800k
Rbw - stage 2 of 6 - construction of one duplex dwg (type 1) with 2 bedrooms, 2 bathrooms & single gge. Proposed timber & keystone retaining wall
- Minor dwellings and sleepouts$480k
Rbw -convert a part of the shed to a minor unit with 2 beds, a bath, a laundry, a open ldk. New bathrm for pool use. & a swimming pool & site retaining wall.
- Fires and heating$7,500
Housing (detached dwg) - install replacement metro tiny freestanding woodburner & flue system through existing roof penetrations with new dektite & soaker flashing, & ash floor protector (known as 1116 coast Rd)
- Alterations and additions$60k
Rbw - proposed enclosure of existing outdoor covered area. Alterations involve construction of a new raft slab on bored pile footings in the outdoor dining area located north-west of the dwg. New
- Retaining walls$150k
Two timber pole retaining walls required behind the yellow stickered shed
- Alterations and additions$70k
Rbw - proposed interior renovations to existing dwg, including master ensuite, wc powder room & laundry.
- New homes$220k
Rbw: construction of new single storey dwg, including two bedrooms, one bathrm, kitchen, & detached dbl gge. Construction of new drainage & plumbing works & onsite wastewater system
- Alterations and additions$89k
Rbw -stabilizing the terrain after a land slide at the property & replacing the existing open slat decks with a new open slat deck
- New homes$1.3m
rbw single level dwg, including four bedrooms, two bathrooms, kitchen, dbl gge. Private drainage, water tanks driveway. Effluent system
- Retaining walls$120k
dbc - timber pole & concrete pile retaining walls
- Retaining walls$165k
New concrete barrier pile retaining wall to western side of house at location of slip.
- Alterations and additions$80k
Rbw - internal alterations (wall removed), new kitchen sink, new external door, new roof beams, posts, replacing external window & door with new (width to match existing)& new foundation.
- Fires and heating$11k
sfh - remove existing gas fire & flue. Install new wood fire & flue through up through existing chimney (firenzo topaz insert zc).
- Pools and spas$90k
build a sprayed concrete swimming pool, timber deck & retaining wall, pool fencing.
- Commercial alterations$750k
Rbw - new pool house with two bedrooms, games room, loft home office & bathrm, new entry, kitchen & wine cellar with internal alterations to top floor bathrooms & bedrooms. New on-site effluent system.
- Fires and heating$2,000
change of fireplace model to jayline is550 woodburner with zero clearance cabinet.
ResidentialCommercial The dots are this page of the list.
Near Redvale
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.