Building consents
Commercial building consents in Swanson
Below: 7 commercial consents we hold in Swanson, searchable and on the map.
Commercial consents on record in Swanson
Individual building consents we hold, each on its property: 7 from 1 Sep 2020 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations2
1 in the last 12 months · typically $89k
- New commercial buildings1
typically $1.8m
- Fit-outs1
typically $500k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $80kRbw - internal change only no exterior alterations existing house refit to bathrm alters location of 2nd bathrm & wardrobe to bedrooms 3 4 form new bdrm-office to part of lounge space, reconf 780-784 Swanson Road
7 consents
- Commercial alterations$80k
Rbw - internal change only no exterior alterations existing house refit to bathrm alters location of 2nd bathrm & wardrobe to bedrooms 3 4 form new bdrm-office to part of lounge space, reconf
- Fit-outs$500k
Structural upgrade of the historic yozin winery. Shell base build for future food & beverage use. Minor demolition at the rear. Add of a new kitchen & toilets block. Fit out is for a future a
- Commercial alterations$98k
Private workshop, timber pole retaining wall support & associated stormwater drainage
- New commercial buildings$1.8m
Rbw - proposed two storey dwg with five bedrooms, an office, two lounges, media room, detached triple gge. A separate minor unit with living, kitchen, bathrm & two bedrooms. Construction of proposed on-site wastewater disposal system, wat
- Commercial alterations$18k
New bathrm & two new wc in existing gge/workshop.
- Commercial alterations$1,000
Move building platform & change foundation for the new standalone gge-workshop bathrm
- Commercial alterations$80k
Construction of a new standalone gge-workshop with bathrm
ResidentialCommercial The dots are this page of the list.
Near Swanson
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.