Building consents
Building consents in Manukau Heads
Below: 31 consents we hold in Manukau Heads, searchable and on the map.
Consents on record in Manukau Heads
Individual building consents we hold, each on its property: 31 from 1 Feb 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating9
4 in the last 12 months · typically $5,827
- New homes4
typically $705k
- Alterations and additions4
typically $100k
- Pools and spas3
1 in the last 12 months · typically $60k
- Retaining walls1
1 in the last 12 months · typically $6,000
- Garages, sheds and carports1
1 in the last 12 months · typically $92k
- Minor dwellings and sleepouts1
typically $874k
- Relocated buildings1
typically $45k
- Repairs, recladding and strengthening1
typically $250k
- New commercial buildings1
typically $4m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $92kConstruction of one-storey detached shed 30 Seaview Terrace
- $8,500Installation of a solid fuel heater to manufacturers specifications - masport Akaroa wood stacker 290 Big Bay Road
- $8,400Installation of a solid fuel heater to manufacturers specifications masport Akaroa ws 212 Big Bay Road
- $8,000Installation of new pool fencing & gate. Fibreglass inground pool under 35,000 litres, exempt from consent - exemption 23 of schedule 1. 17 Greenock Drive
- $7,000Installation of a freestanding metro rad one solid fuel heater. 17 Wattle Bay Road
31 consents
- Fires and heating$4,000
Fireplace freestanding freestanding metro wee rad woody fire
- Fires and heating$7,000
Installation of a freestanding metro rad one solid fuel heater.
- Garages, sheds and carports$92k
Construction of one-storey detached shed
- Fires and heating$8,500
Installation of a solid fuel heater to manufacturers specifications - masport Akaroa wood stacker
- Retaining walls$6,000
Construction of a timber pole retaining wall approximately 9m long & 1.5m angled section to return. Varying from 1.1 to 1.8m in adjacent to a graveled driveway that is gently sloping towards the ret
- Fires and heating$8,400
Installation of a solid fuel heater to manufacturers specifications masport Akaroa ws
- Pools and spas$8,000
Installation of new pool fencing & gate. Fibreglass inground pool under 35,000 litres, exempt from consent - exemption 23 of schedule 1.
- Alterations and additions$90k
Alt to dwg - extension of building to form library
- New commercial buildings$4m
Owner / builder rbw - new dwg, with: lower ground gge, upper ground, 3 bedrooms, 3 bathrooms library, home office & media room. Swimming pool, onsite wastewater system, stormwater soakage pi
- Fires and heating$5,700
installation of a solid fuel heater to manufacturers specifications metro tiny rad base fire.
- New homes$1.5m
Rbw - three storey detached house with five bedrooms, 5.5 bathrooms, living, dining, kitchen, dbl gge, pool, & including retaining walls with lift & detention water tank
- Alterations and additions$150k
A 17m long timber debris catch fence located 1-2m uphill of the existing dwg.
- Fires and heating$7,324
Installation of a solid fuel heater to manufacturers specifications - metro wee rad leg Ltd with wetback connection, replacing existing wood fire
- New homes$420k
Construction of dwg with attached gge
- Alterations and additions$80k
Rbw - 301106 new four bdrm dwg transported to site placed on timber piles, includes all relevant site works & foundations
- Pools and spas$2m
Construction of dwg, associated site works & spa pool
- Fires and heating$5,827
Installation of a solid fuel heater to manufacturers specifications metro wee rad leg rural.
- New homes$610k
Construct a new 154m2 3 bdrm dwg with attached gge.
- Repairs, recladding and strengthening$250k
R3 - partial re-clad & remediation to existing three-storey detached dwg.
- New homes$800k
R3 - new two-storey detached dwg.
- Fires and heating$5,662
installation of a solid fuel heater to manufacturers specifications - metro wee rad leg
- Relocated buildings$45k
rbw - relocate an existing building to site, new foundations & drainage.
- Minor dwellings and sleepouts$874k
Rbw - new single storey dwg including three bedrooms, two bathrooms, kitchen, demolition of existing cliff edge baches (x3) & convert existing dwg into sleepout
- Alterations and additions$110k
Rbw - a master bdrm, ensuite add & small extension to the rear of the existing dwg.
- Fires and heating$5,534
installation of a solid fuel heater to manufacturers specifications (metro wee rad leg)
ResidentialCommercial The dots are this page of the list.
Near Manukau Heads
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.