Below: 9 commercial consents we hold in Balclutha, searchable and on the map.
Commercial consents on record in Balclutha
Individual building consents we hold, each on its property: 9 from 1 Sep 2020 to 1 Nov 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations3
typically $45k
- New commercial buildings1
typically $13m
- Farm buildings1
typically $65k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
9 consents
- Commercial alterations$10k
Construct a bathrm in the workshop
- New commercial buildings$13m
Construction of building blocks b & c (27 apartments, three storeys), attached to existing block d of bupa parkstone retirement village - stage 2 of 2 - floor slabs, superstructures, building envelopes, internal fitouts, services, completion of civil
- Farm buildings$65k
Erect gge / implement shed
- Commercial alterations$90k
rbw brand new factory built dwg being delivered to site where foundations, construction of decks, retaining walls, installation & connection into new septic system, drainage work will be carried out.
- Commercial alterations$45k
Install games room/bar/lounge & bathrm areas within existing basement / subfloor area
- Commercial alterations$40k
Erect gge / workshop
- Commercial alterations$86k
Erect workshop / gge with bathrm
- Relocated buildings$4,000
Relocate existing foul drain running through Rosebank primary school & install new lateral to council sewer
- Commercial alterations$8,800
Erect workshop adjoining existing gge
ResidentialCommercial The dots are this page of the list.
Suburbs in Balclutha
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.