Building consents
Building consents in Hillend
Below: 7 consents we hold in Hillend, searchable and on the map.
Consents on record in Hillend
Individual building consents we hold, each on its property: 7 from 1 Aug 2021 to 1 Dec 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports2
1 in the last 12 months · typically $47k
- Alterations and additions2
typically $163k
- New homes2
typically $367k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $25kErect 3 bay pole shed with one enclosed bay 1042 Hillend Road
7 consents
- Garages, sheds and carports$25k
Erect 3 bay pole shed with one enclosed bay
- New homes$350k
Proposed extension to existing shed. Timber framed single level building on insulated concrete slab, trussed roof, profiled metal cladding & roof, thermally broken aluminum joinery with low-e glazing, one bdrm with open living, 1 bathrm, wir,
- Alterations and additions$300k
Extend existing house to the north by 30m2, new kitchen & lounge area. Install new wood burner
- New homes$385k
New dwg at big river yard & transported to site on timber pile foundation, install septic tank
- Alterations and additions$25k
Replace existing cladding with iron - home owner exemption
- Garages, sheds and carports$68k
Erect gge & install effluent field
- Fires and heating$6,800
Install solid fuel heater - pyroclassic iv woodburner
ResidentialCommercial The dots are this page of the list.
Near Hillend
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.