Building consents
Residential building consents in Blackball
Below: 5 residential consents we hold in Blackball, searchable and on the map.
Residential consents on record in Blackball
Individual building consents we hold, each on its property: 5 from 1 Feb 2022 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $7,501
- Fires and heating2
typically $5,500
- New homes1
1 in the last 12 months · typically $475k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $475k2 bdrm domestic dwg outbuilding - shed , Atarau
- $1Install of a grey water system for grey water. Toilet black water & sewer will be going through a composting toilet with elements to remove all Blackwater & sewer. Amendment 1: toilet has changed from propossed toilet due to supply issues & loc 774 Atarau Road, Atarau
5 consents
- Plumbing, drainage and wastewater$1
Install of a grey water system for grey water. Toilet black water & sewer will be going through a composting toilet with elements to remove all Blackwater & sewer. Amendment 1: toilet has changed from propossed toilet due to supply issues & loc
- New homes$475k
2 bdrm domestic dwg outbuilding - shed
- Plumbing, drainage and wastewater$15k
Install of a grey water system for grey water. Toilet black water & sewer will be going through a composting toilet with elements to remove all Blackwater & sewer.
- Fires and heating$5,000
Installation of a new woodsman stag solid fuel heater & heatsaver flue
- Fires and heating$6,000
Install woodsman stag dry multifuel fire in dwg
ResidentialCommercial The dots are this page of the list.
Suburbs in Blackball
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.