Building consents
Building consents in Burnham
Below: 35 consents we hold in Burnham, searchable and on the map.
Consents on record in Burnham
Individual building consents we hold, each on its property: 35 from 1 Mar 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating10
3 in the last 12 months · typically $5,000
- Garages, sheds and carports5
1 in the last 12 months · typically $38k
- Alterations and additions5
typically $7,500
- Repairs, recladding and strengthening2
1 in the last 12 months · typically $63k
- New homes2
typically $426k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $150k
- Pools and spas1
1 in the last 12 months · typically $95k
- Plumbing, drainage and wastewater1
typically $3,000
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $150kConstruction of 2 bdrm sleepout 500 Two Chain Road, Burnham
- $95kConstruction of res swimming pool & associated 451 Swamp Road, Burnham
- $30kDwg alterations - recladding gable ends 451 Swamp Road, Burnham
- $6,500Install metro Ltd mega rad on base freestanding woodburner 41 Sandy Knolls Road, Burnham
- $5,000Installation of solid fuel heater - masport r1200 ped 500 Two Chain Road, Burnham
35 consents
- Repairs, recladding and strengthening$30k
Dwg alterations - recladding gable ends
- Fires and heating$5,000
Installation of solid fuel heater - masport r1200 ped
- Garages, sheds and carports$3,000
Amendment: change of cladding above gge & sliding door.
- Pools and spas$95k
Construction of res swimming pool & associated
- Fires and heating$6,500
Install metro Ltd mega rad on base freestanding woodburner
- Fires and heating$5,000
Installation of solid fuel heater-firenzo contessa
- Minor dwellings and sleepouts$150k
Construction of 2 bdrm sleepout
- New homes$257k
Construction of detached dwg - single storey with 2
- Fires and heating$5,000
Installation of solid fuel heater - masport osburn 1600
- Alterations and additions$1,000
Amendment - add of shower
- Fires and heating$5,000
Installation of solid fuel heater - maxen kinmont
- Plumbing, drainage and wastewater$3,000
Outbuilding alterations - add of toilet
- Fires and heating$4,000
Installation of solid fuel heater - masport r3000
- Alterations and additions$1
To remove the timber facia & fix spouting to the solid
- Repairs, recladding and strengthening$95k
Dwg alterations - first floor reclad & windows
- Alterations and additions$100k
Dwg alterations - extension including ensuite, walk in
- Fires and heating$5,000
Installation of solid fuel heater - woodsman ecr novo
- Fires and heating$6,500
New solid fuel heater-log fire
- Alterations and additions$7,500
Amendment 1 change to tiled shower.
- Garages, sheds and carports$38k
Construction of outbuilding - gge
- Alterations and additions$250k
Dwg alterations - replace roof cladding. Partially
- Garages, sheds and carports$250k
Construction of outbuilding - 2 bay gge & attached
- Garages, sheds and carports$180k
Dwg alterations - convert gge into master bdrm
- Garages, sheds and carports$25k
Construction of outbuilding 4 bay pole shed
- Fires and heating$3,200
Installation of solid fuel heater - metro xtreme rad woody
ResidentialCommercial The dots are this page of the list.
Suburbs in Burnham
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.