Building consents
Building consents in Arapohue
Below: 9 consents we hold in Arapohue, searchable and on the map.
Consents on record in Arapohue
Individual building consents we hold, each on its property: 9 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports2
1 in the last 12 months · typically $114k
- Fires and heating2
typically $6,000
- Relocated buildings2
typically $82k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $132kNew gge 21 Bee Bush Road
9 consents
- Garages, sheds and carports$132k
New gge
- Relocated buildings$13k
3 bdrm second hand relocated dwg - timber decks, foundations & drainage - private ww amendment 1: septic tank onsite ww amendment 2: replaced existing concrete tiles roofing to new corrugated metal roofing with new roof underlay, timber pur
- Fires and heating$7,000
New maxen kinmont 350 leg base wood fire & flue system with wet-back onto existing hearth
- Fires and heating$5,000
Install new maxen kinmont 350 - pedestal woodfire & flue system onto existing floor hearth
- Garages, sheds and carports$95k
Shed with bathrm. Onsite ww
- Relocated buildings$150k
3 bdrm second hand relocated dwg - timber decks, foundations & drainage - private ww
- Plumbing, drainage and wastewater$16k
To install a naturalflow nf8000p wastewater treatment system
- Plumbing, drainage and wastewater$10k
Wastewater upgrade
- Pools and spas$5,000
Pool fence
ResidentialCommercial The dots are this page of the list.
Near Arapohue
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.