Building consents
Building consents in Dillons Point
Below: 225 consents we hold in Dillons Point, searchable and on the map.
Consents on record in Dillons Point
Individual building consents we hold, each on its property: 225 from 1 Mar 2020 to 1 Feb 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
1 in the last 12 months · typically $304k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $8,000Inbuilt yunca xander solid fuel heater 507 Dillons Point Road, Dillons Point
225 consents
- Fires and heating$8,000
Inbuilt yunca xander solid fuel heater
- Fires and heating$600k
Res alterations & additions & solid fuel heater
- Fires and heating$4,500
Free-standing masport r5000 log fire
- Fires and heating
Legalise Freestanding Magnum P300 Log Fire
- New homes
Dwelling with Attached Garage and Log Fire
- Demolition
Remove Dwelling
- Plumbing, drainage and wastewater
Drainage Work - Filter Trenches and Bio Filter
- Alterations and additions
Exterior Solid Plaster
- New homes
Dwelling with Attached Garage
- Alterations and additions
Dwelling
- Garages, sheds and carports
Garage
- New homes
Two Storey Dwelling
- Alterations and additions
Alteration
- Garages, sheds and carports
Shed
- Plumbing, drainage and wastewater
Septic Tank and Effluent Disposal
- Garages, sheds and carports
Garage
- Fires and heating
Free Standing Masport LE5000 Log Fire
- Garages, sheds and carports
Shed
- New homes
Dwelling with Gas Fire, Plus Barn (With Attached Garage, Office & Relocated Shed)
- Demolition
Remove Dwelling
- Garages, sheds and carports
Remove Garage
- Alterations and additions
Farm Building
- Alterations and additions
Dwelling
- Garages, sheds and carports
Shed
- Alterations and additions
Outbuilding
ResidentialCommercial The dots are this page of the list.
Suburbs in Dillons Point
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.