Building consents
Building consents in Doyleston
Below: 22 consents we hold in Doyleston, searchable and on the map.
Consents on record in Doyleston
Individual building consents we hold, each on its property: 22 from 1 Dec 2020 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating8
2 in the last 12 months · typically $5,000
- New homes4
1 in the last 12 months · typically $255k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $2,000
- Garages, sheds and carports2
typically $32k
- Alterations and additions2
typically $27k
- Pools and spas1
typically $5,000
- Relocated buildings1
typically $40k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $270kConstruction of detached dwg - single storey with 2 1427 Leeston Road, Doyleston
- $5,000Installation of solid fuel heater - maxen kinmont 350-w 1443 Leeston Road, Doyleston
- $5,000Installation of solid fuel heater - masport Kaituna leg 412 Drain Road, Doyleston
- $3,000Amendment - add 2 internal walls, 1 wastewater pipe & 1 33 Petticoat Lane, Doyleston
22 consents
- Fires and heating$5,000
Installation of solid fuel heater - maxen kinmont 350-w
- New homes$270k
Construction of detached dwg - single storey with 2
- Fires and heating$5,000
Installation of solid fuel heater - masport Kaituna leg
- Plumbing, drainage and wastewater$3,000
Amendment - add 2 internal walls, 1 wastewater pipe & 1
- Plumbing, drainage and wastewater$1,000
Plumbing & drainage to match ea
- Alterations and additions$25k
Outbuilding alterations - add of bathrm to 7.0
- Garages, sheds and carports$44k
Construction of outbuilding - steel framed gge
- New homes$206k
Construction of detached dwg - single storey with 2
- New homes$240k
Construction of detached dwg - single storey with 2
- Fires and heating$1
Installation of solid fuel heater - masport osburn 1600
- Pools and spas$5,000
Construction of res swimming pool & associated
- Fires and heating$5,000
Installation of solid fuel heater - osburn 1600
- Fires and heating$8,000
Installation of solid fuel heater - metro wee rad (base)
- Relocated buildings$40k
Relocate dwg to site - construct foundations, alt stormwater drainage & connect to three water tanks, install septic system
- Fires and heating$7,399
Installation of a solid fuel heater - firenzo lady kitchener
- Fires and heating$4,500
Installation of solid fuel heater - jayline fr400. Ecan
- Fires and heating$5,000
Installation of solid fuel heater - masport Waimakariri
- Alterations and additions$29k
Certificate of acceptance - existing included: the exterior
- Garages, sheds and carports$20k
Construction of outbuilding 2 bay gge
- New homes$379k
3 bdrm domestic dwg with attached gge
- Alterations and additions$10k
Dwg alterations
- New homes$220k
3 bdrm domestic dwg, ...
ResidentialCommercial The dots are this page of the list.
Suburbs in Doyleston
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.