Building consents
Building consents in Runciman
Below: 18 consents we hold in Runciman, searchable and on the map.
Consents on record in Runciman
Individual building consents we hold, each on its property: 18 from 1 Aug 2019 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
2 in the last 12 months · typically $6,687
- Alterations and additions3
typically $90k
- Pools and spas2
typically $61k
- New homes1
1 in the last 12 months · typically $1.6m
- Commercial alterations1
typically $5m
- Decks, pergolas and verandahs1
typically $40k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.6mRbw - new single-storey dwg including four bedrooms, an open-plan kitchen with scullery, living & lounge areas, & a media room, an attached triple gge, two ensuites, a laundry, a water clo 35 Amberfields Way
- $8,551installation of a new freestanding solid fuel heater - masport Kaituna. 744 Runciman Road
- $5,900Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications metro wee rad base Ltd replaces existing fire. 710 Runciman Road
18 consents
- New homes$1.6m
Rbw - new single-storey dwg including four bedrooms, an open-plan kitchen with scullery, living & lounge areas, & a media room, an attached triple gge, two ensuites, a laundry, a water clo
- Fires and heating$5,900
Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications metro wee rad base Ltd replaces existing fire.
- Fires and heating$8,551
installation of a new freestanding solid fuel heater - masport Kaituna.
- Commercial alterations$5m
Rbw - site consent including but not limited to building foundations, service connections within modules & balance of townhouse works. Townhouses are pre-fabricated in a factory offsite under stage
- Alterations and additions$7,500
New heating appliance
- Pools and spas$60k
Installation of new rizzare vt2 pool fencing & gate & delta aluminium pool fencing & gate. Fibreglass inground pool over 35,000l.
- Fires and heating$6,687
Sfh - installation of a solid fuel heater to manufacturers specifications woodsman Tarras mkiii
- Alterations and additions$90k
Rbw - interior alterations to the existing living space including new joinery, engineered beams, relocate & replace existing wood burner with new & a new deck less than 1m high.
- Pools and spas$61k
installation of a pre-moulded in-ground swimming pool, spa & associated swimming pool fencing
- Decks, pergolas and verandahs$40k
rbw- 41m2 deck add to existing deck & a 48m2 verandah over the deck.
- Alterations and additions$250k
Rbw - add to existing dwg including new ensuite & w.i.r. New entry, dining & laundry-mud room.
- Fires and heating$4,388
installation of a solid fuel heater to manufacturers specifications (masport r3000)
- Alterations and additions$250k
Rbw - existing dwg - removal of 2x posts & associated roof beams, to be replaced with 2x long span beams. In-ground swimming pool with fencing.
- Insulation$7,305
install insulmax wall insulation into exterior walls.
- Pools and spas$75k
construct swimming pool & pool barrier
- Pools and spas$60k
Proposed inground swimming pool, pool house & pool fencing
- Fires and heating$4,500
sfh - installation of new wood fire
- Alterations and additions$80k
installation of prefabricated, in ground, ceramic composite swimming pool & fencing & clearvue covered pergola.
ResidentialCommercial The dots are this page of the list.
Near Runciman
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.