Building consents

Commercial building consents in Feilding

Below: 12 commercial consents we hold in Feilding, searchable and on the map.

Consents we hold121 in the last 12 monthsSearch them ↓

Commercial consents on record in Feilding

Individual building consents we hold, each on its property: 12 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Commercial alterations5

    typically $65k

  2. Fit-outs4

    1 in the last 12 months · typically $130k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 1June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 1January 2025: 0February 2025: 0March 2025: 1April 2025: 0May 2025: 1June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 1August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $220kInternal alterations. New bathrm, replace old kitchen, inclusion of wardrobes; laundry & mud room fitout. 544 Kimbolton Road

12 consents

  1. Fit-outs$220k

    Internal alterations. New bathrm, replace old kitchen, inclusion of wardrobes; laundry & mud room fitout.

    544 Kimbolton Road · 1 Jul 2026 · 136456/1

  2. Commercial alterations$1,500

    P2 -p2 - replace ceiling joists to kitchen, add office beam, modify bracing & pantry lintel.##p1 - extend & renovate existing dwg & add an attached gge.

    32 Colyton Road · 1 May 2025 · 133932/2

  3. Fit-outs$15k

    Line & fit out an existing store room into an ensuite. No changes to external or internal dimensions

    26 Pirinoa Street · 1 Mar 2025 · 134900/1

  4. Commercial alterations$65k

    Change of use: northern single level & 2nd level from commercial to res single household use. Internal alterations to add 2nd level bathrm & ground floor bathrm. Separate off southern building to remain as commercial use.

    16 Owen Street · 1 Dec 2024 · ABA/2023/0694

  5. Commercial alterations$200k

    Extension to existing dwg, including a new family area, dining room & lounge, office, & the relocation of the existing main entrance & kitchen.

    32 Wapiti Avenue · 1 May 2024 · 134142/1

  6. Fit-outs$200k

    Housing (detached dwg) - retrofit of existing dwg to improve thermal performance & modernise layout; full re-clad with new timber weatherboard cladding, new bracing & smoke alarm layouts, re-clad inter-tenancy fire wall, re-roof weather-t

    16 Poole Street · 1 Oct 2023 · CKO2301726

  7. Fit-outs$60k

    Interior renovation of a bathrm & office in a private residence.

    120 Lethbridge Street · 1 Aug 2023 · 133359/1

  8. Commercial alterations$70k

    Internal alterations including changing first floor bdrm to a bathrm, altering existing upstairs bathrm, changing ground floor office to bathrm, replacing septic system.

    34 Lees Road · 1 Aug 2023 · 133532/1

  9. Commercial alterations$50k

    Alt to existing residence to convert existing gge into new bathrm, bdrm & office

    22 McClure Street · 1 Mar 2022 · 131815/1

  10. Commercial alterations$25k

    Convert existing office into the ensuite with vinyl flooring

    16 Pirinoa Street · 1 Jan 2021 · 130590/1

  11. Commercial alterations$56k

    12.0m long x 9.0m wide gge workshop

    112 Halcombe Road · 1 Aug 2020 · 130129/1

  12. Commercial alterations$70k

    Gable end extension to existing gge to add additional rooms, new gge & workshop

    63 Wapiti Avenue · 1 Aug 2019 · 129123/1

ResidentialCommercial The dots are this page of the list.

Near Feilding

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.