Building consents
Building consents in Waituna West
Below: 11 consents we hold in Waituna West, searchable and on the map.
Consents on record in Waituna West
Individual building consents we hold, each on its property: 11 from 1 Jan 2020 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
1 in the last 12 months · typically $8,000
- Plumbing, drainage and wastewater2
typically $15k
- Alterations and additions1
typically $50k
- New homes1
typically $518k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $11kInstall a metro mega rad leg freestanding wood fire into living room. 89 Waituna Tapuae Road
11 consents
- Fires and heating$11k
Install a metro mega rad leg freestanding wood fire into living room.
- Fires and heating$70k
Kitchen alterations & installation of new woodburner
- Fires and heating$4,000
Installation of a sparky multi fuel burner
- Fires and heating$3,000
Installation of freestanding metro r2 fire.
- Fires and heating$8,000
Install a metro xtreme rad woody free standing wood fire, standard flue on new hearth with wetback connecting onto existing hwc
- Plumbing, drainage and wastewater$15k
Install wastewater system - oasis clearwater 2000
- Plumbing, drainage and wastewater$15k
P2 - amendment to include wastewater & also, the original floorplan was the future floorplan & we are now submitting the aslaid floorplan (how it stands now). Please see photos of the dwg in the plans that show these rooms.##p1 - to relocate
- Alterations and additions$50k
Delivery of a newly built 2 bdrm transportable home to property & secured onto timber piles.
- New homes$518k
Construct new 3 bdrm dwg
- New homes$400k
New 3 bdrm res dwg with attached dbl gge, open plan kitchen & dining room, separate family room, separate lounge with covered area from it
- New homes$200k
Proposed 3 bdrm dwg
ResidentialCommercial The dots are this page of the list.
Near Waituna West
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.