Building consents
Residential building consents in Fordell
Below: 32 residential consents we hold in Fordell, searchable and on the map.
Residential consents on record in Fordell
Individual building consents we hold, each on its property: 32 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating11
4 in the last 12 months · typically $6,000
- New homes6
2 in the last 12 months · typically $361k
- Alterations and additions4
1 in the last 12 months · typically $35k
- Garages, sheds and carports3
typically $50k
- Decks, pergolas and verandahs1
typically $20k
- Minor dwellings and sleepouts1
typically $100k
- Relocated buildings1
typically $12k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.4mNew single storey three bdrm home to replace previous home in the same location which burnt down 1021 No 2 Line, Fordell
- $360kConstruct a new 3.5 bdrm dwg on timber piles with vertical corrugated cladding & cedar accents. Septic system & log burner to be installed 763 No 2 Line, Fordell
- $55kConstruct a 7m x 10m x 2.7m totalspan 26 Budge Street, Fordell
- $9,000Alt.1 replace existing fire in the main lounge, with new metro xtreme rad fireplace & metro eco flue. Note: this is in add to the existing consent (bcon26-0232) to replace the fire i 120 Union Line, Fordell
- $7,000Free standing solid fuel. Replace existing fire with new metro tiny rad woody + alt.1 replace existing fire in the main lounge, with new metro xtreme rad fireplace & metro eco flue. N 120 Union Line, Fordell
32 consents
- Fires and heating$7,000
Free standing solid fuel. Replace existing fire with new metro tiny rad woody + alt.1 replace existing fire in the main lounge, with new metro xtreme rad fireplace & metro eco flue. N
- Fires and heating$9,000
Alt.1 replace existing fire in the main lounge, with new metro xtreme rad fireplace & metro eco flue. Note: this is in add to the existing consent (bcon26-0232) to replace the fire i
- New homes$360k
Construct a new 3.5 bdrm dwg on timber piles with vertical corrugated cladding & cedar accents. Septic system & log burner to be installed
- New homes$1.4m
New single storey three bdrm home to replace previous home in the same location which burnt down
- Fires and heating$5,000
Free standing solid fuel heater project description: removeal of existing metro freestanding fire. Installation of new ash hearth & Ltd metro wee rad woody. New 150mm flue to be installed & so
- Fires and heating$7,000
Installation of metro tiny woody with a metro eco flue in the lounge. Install soaker flashing for flue
- Alterations and additions$55k
Construct a 7m x 10m x 2.7m totalspan
- Garages, sheds and carports$50k
Construct a detached gge
- Decks, pergolas and verandahs$20k
New 32m² roof over existing deck
- Fires and heating$5,500
Alt to dwg - installation of woodsman kanaku ped, freestanding dry, woodburner cac 223218
- Fires and heating$5,000
Replacement of woodburner
- New homes$362k
Construct new 65m2 dwg
- Relocated buildings$12k
Relocating a toilet into a new ensuite area. Adding a shower & vanity unit. Add a window
- Fires and heating$7,000
Install freestanding woodfire & change existing shower to wet area shower
- New homes$190k
Construct a two bdrm dwg
- New homes$465k
Construct new 4 bdrm dwg
- New homes$300k
New single storey 3 bdrm house
- Minor dwellings and sleepouts$100k
Construct new 2 bdrm house/sleepout
- Alterations and additions$12k
Install new contessa ru with wetback,
- Fires and heating$6,000
Install a metro mega rad freestanding wood burner into the lounge
- Fires and heating$5,000
To install a freestanding metro xtreme rad fire heating
- Alterations and additions$15k
4.5m2 add & bathrm alterations
- Fires and heating$7,705
Install a freestanding metro xtreme rad wood burner with wetback into lounge area
- Garages, sheds and carports$5,000
Removing a wall between bdrm & gge. Extending the bdrm & adding a toilet & whb. Add new wall. Reducing the gge door size
- Garages, sheds and carports$180k
Add of 72m2 including: attached gge, laundry & bdrm
ResidentialCommercial The dots are this page of the list.
Suburbs in Fordell
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.