Building consents
Building consents in Waituhi
Below: 9 consents we hold in Waituhi, searchable and on the map.
Consents on record in Waituhi
Individual building consents we hold, each on its property: 9 from 1 Dec 2019 to 1 Dec 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports1
1 in the last 12 months · typically $800k
- New homes1
typically $600k
- Repairs, recladding and strengthening1
typically $400k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $800kConstruct shed, convert one bay into self-contained unit & install freestanding woodsman serene logfire 85 Judd Road
9 consents
- Garages, sheds and carports$800k
Construct shed, convert one bay into self-contained unit & install freestanding woodsman serene logfire
- Repairs, recladding and strengthening$400k
Repile existing dwg, internal alterations & extensions to existing dwg, install two new verandahs with roof, change layout of dwg & remove fireplace & hearth.
- New homes$600k
Erect two storey dwg with attached gge, connect to existing septic system & water tanks, install freestanding woodsman Tarras mkiii logfire
- Alterations and additions$20k
Alt to bathrm to form wet area vinyl shower
- Fires and heating$6,500
Install freestanding yunca monte multifuel logfire
- Garages, sheds and carports$27k
Erect versatile gge
- Fires and heating$5,500
Install freestanding yunca Hobson logfire
- Fires and heating$7,000
Install freestanding yunca monte multi fuel logfire
- Decks, pergolas and verandahs$13k
Cover existing deck which has an area of greater than 20m2
ResidentialCommercial The dots are this page of the list.
Near Waituhi
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.