Building consents
Building consents in Glen Massey
Below: 15 consents we hold in Glen Massey, searchable and on the map.
Consents on record in Glen Massey
Individual building consents we hold, each on its property: 15 from 1 Jan 2021 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
typically $4,824
- New homes2
1 in the last 12 months · typically $709k
- Alterations and additions1
1 in the last 12 months · typically $14k
- Plumbing, drainage and wastewater1
typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $607kDwg with attached dbl gge. 906 Waingaro Road, Glen Massey
- $14kConvert existing storage room to new bathrm & wc 640 Waingaro Road, Glen Massey
15 consents
- New homes$607k
Dwg with attached dbl gge.
- Alterations and additions$14k
Convert existing storage room to new bathrm & wc
- Fires and heating$1,000
Heater
- Fires and heating$5,000
Heater - masport MacKenzie r10000 second-hand
- Fires and heating$4,824
Heater - maxen fireplaces cargill 350 ultra low emission burner
- Plumbing, drainage and wastewater$20k
Replace failed septic system with new treatment plant & driplines
- Fires and heating$6,000
Heater
- New homes$810k
Dwg with solid fuel heater & attached dbl gge. Shed with wc & tub (future lot 2).
- Fires and heating$2,000
Installation of second hand heater
- New homes$375k
4 bdrm domestic dwg with attached gge, ...
- New homes$395k
3 bdrm domestic dwg with attached gge, ...
- New homes$621k
New 2-storey dwg
- Garages, sheds and carports$25k
Reclad new iron cladding, joinery to existing shed
- Fires and heating$6,000
Heater
- Alterations and additions$40k
Dining room extension
ResidentialCommercial The dots are this page of the list.
Suburbs in Glen Massey
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.