Building consents
Commercial building consents in Glenbrook
Below: 6 commercial consents we hold in Glenbrook, searchable and on the map.
Commercial consents on record in Glenbrook
Individual building consents we hold, each on its property: 6 from 1 Oct 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New commercial buildings2
1 in the last 12 months · typically $3.3m
- Commercial alterations2
typically $259k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $650kRbw - new 2-storey dwg with attached gge, 3-bdrm, office, two bathrooms, wc, family, living, dining & kitchen. Construction includes deck & wastewater pump. 55 Tai Tauwhare Road, Glenbrook
6 consents
- New commercial buildings$650k
Rbw - new 2-storey dwg with attached gge, 3-bdrm, office, two bathrooms, wc, family, living, dining & kitchen. Construction includes deck & wastewater pump.
- Commercial alterations$499k
Rbw - res add - two storey in part, new two bay gge, living area, office, bathrm & balcony with glass balustrade. Alterations to the existing layout include new bdrm & prayer r
- New commercial buildings$6m
Rbw - new two storey dwg, four-bedrooms, two-bathrooms, two-wcs, office, games room, internal access dbl gge, swimming & spa pool, onsite wastewater system.
- Commercial alterations$20k
Rbw - small extension of living area, adding a bdrm, office & an ensuite.
- Commercial alterations$40k
Rbw - proposed single-storey timber-framed pool pavilion with changing room, toilet & storage.
- Commercial alterations$140k
rbw: add of bdrm plus ensuite, walk in wardrobe & office to existing dwg.
ResidentialCommercial The dots are this page of the list.
Suburbs in Glenbrook
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.