Building consents

Building consents in Rapahoe

Below: 10 consents we hold in Rapahoe, searchable and on the map.

Consents we hold102 in the last 12 monthsSearch them ↓

Consents on record in Rapahoe

Individual building consents we hold, each on its property: 10 from 1 Jun 2022 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating5

    1 in the last 12 months · typically $7,000

  2. Garages, sheds and carports4

    1 in the last 12 months · typically $1

  3. Plumbing, drainage and wastewater1

    typically $5,000

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 1February 2024: 0March 2024: 1April 2024: 0May 2024: 0June 2024: 0July 2024: 1August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 1January 2025: 1February 2025: 0March 2025: 0April 2025: 0May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 1January 2026: 1February 2026: 0March 2026: 0April 2026: 0May 2026: 0June 2026: 0July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $8,500Install maxen kinmont 450 wood fire to a domestic dwg 1060 Stewart Street
  2. $1New dwg, 1 bdrm, 1 bathrm, attached gge amendment 1: description amendment to an approved building consent. Add of covered deck, & amended internal floor/layout. Note: the dwg non existing, it is currently under construction. 5 Hawken Street

10 consents

  1. Fires and heating$8,500

    Install maxen kinmont 450 wood fire to a domestic dwg

    1060 Stewart Street · 1 Jan 2026 · BC998726

  2. Garages, sheds and carports$1

    New dwg, 1 bdrm, 1 bathrm, attached gge amendment 1: description amendment to an approved building consent. Add of covered deck, & amended internal floor/layout. Note: the dwg non existing, it is currently under construction.

    5 Hawken Street · 1 Dec 2025 · 994644.A4

  3. Fires and heating$8,000

    Install woodsman Tasman mkii wood dry fire to a domestic dwg

    2 McLeod Street · 1 Jan 2025 · BC998349

  4. Fires and heating$7,000

    Free standing fire - Metro LTD Mega Rad Freestanding Fire with Wetback

    1 McLeod Street · 1 Dec 2024 · 305529

  5. Garages, sheds and carports$1

    New dwg, 1 bdrm, 1 bathrm, attached gge amendment 1: description amendment to an approved building consent. Add of covered deck, & amended internal floor/layout. Note: the dwg non existing, it is currently under construction.

    5 Hawken Street · 1 Jul 2024 · 994644.A3

  6. Garages, sheds and carports$1

    New dwg, 1 bdrm, 1 bathrm, attached gge amendment 1: description amendment to an approved building consent. Add of covered deck, & amended internal floor/layout. Note: the dwg non existing, it is currently under construction.

    5 Hawken Street · 1 Mar 2024 · 994644.A2

  7. Garages, sheds and carports$50k

    New dwg, 1 bdrm, 1 bathrm, attached gge amendment 1: description amendment to an approved building consent. Add of covered deck, & amended internal floor/layout. Note: the dwg non existing, it is currently under construction.

    5 Hawken Street · 1 Jan 2024 · 994644.A1

  8. Plumbing, drainage and wastewater$5,000

    Drainage

    8 Statham Street · 1 Sep 2023 · BC997921

  9. Fires and heating$7,000

    Install new woodsman rmf (dry)

    1057 Stewart Street · 1 Jun 2023 · BC997872

  10. Fires and heating$1,500

    Existing heating appliance + flue kit (yunca qewb) to be removed. Replaced by new woodsman coaster heating appliance + flue kit.

    16 Morpeth Street · 1 Jun 2022 · BC997539

ResidentialCommercial The dots are this page of the list.

Near Rapahoe

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.