Building consents
Building consents in Claudelands
Below: 75 consents we hold in Claudelands, searchable and on the map.
Consents on record in Claudelands
Individual building consents we hold, each on its property: 75 from 1 Sep 2019 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New commercial buildings33
4 in the last 12 months · typically $72k
- Alterations and additions7
2 in the last 12 months · typically $35k
- Fires and heating6
1 in the last 12 months · typically $5,750
- Plumbing, drainage and wastewater5
5 in the last 12 months · typically $8,000
- New homes4
1 in the last 12 months · typically $250k
- Minor dwellings and sleepouts3
2 in the last 12 months · typically $40k
- Decks, pergolas and verandahs2
1 in the last 12 months · typically $23k
- Commercial alterations2
1 in the last 12 months · typically $55k
- Retaining walls1
1 in the last 12 months · typically $400k
- Garages, sheds and carports1
1 in the last 12 months · typically $205k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $430kNew dwg with attached gge 25 Thames Street
- $400kNew retaining wall 205 River Road
- $205kGge with storage & bathrm 21 Bailey Avenue
- $75kWorkshop gge with mudroom & storage 272 River Road
- $75kRbw - factory construction of a transportable unit (10x3) with a bdrm, a bathrm, living area & kitchen. 141 Boundary Road
75 consents
- Minor dwellings and sleepouts$40k
Rbw - connecting structure hallway joining existing main single storey house & studio single storey house.
- Decks, pergolas and verandahs$41k
New deck at front of house
- Garages, sheds and carports$205k
Gge with storage & bathrm
- Plumbing, drainage and wastewater$10k
New hcc wastewater drainage
- Plumbing, drainage and wastewater$8,000
New private drainage
- Plumbing, drainage and wastewater$8,000
New private wastewater drainage
- Plumbing, drainage and wastewater$8,000
New private wastewater drainage
- Plumbing, drainage and wastewater$40k
New stormwater drainage for res units
- Fires and heating$6,500
Install masport r5000 woodfire on ash floor protector
- Commercial alterations$75k
Workshop gge with mudroom & storage
- Minor dwellings and sleepouts$4,000
Have built an exempt 12msq cabin & require a consent for water
- Alterations and additions$5,000
New ensuite to master bdrm
- Alterations and additions$35k
Rbw - remove bathrm wall linings & bathrm flooring. Replace flooring with plywood & wall linings with plasterboard. Install tiled shower & floor & wall tiles over wpm.
- Retaining walls$400k
New retaining wall
- New homes$430k
New dwg with attached gge
- New commercial buildings$75k
Rbw - factory construction of a transportable unit (10x3) with a bdrm, a bathrm, living area & kitchen.
- New commercial buildings$65k
Rbw - work is for the construction of a new transportable unit (s1036r-14). The unit will include two bedrooms, one bathrm, a living area, & a kitchen. Note: factory build only & does not includ
- New commercial buildings$70k
Rbw - scope of work: proposed work is for the construction of a new transportable unit (s1236r-1-13), the unit will include two bedrooms, one bathrm, a living area, & a kitchen. Note: factory buil
- New commercial buildings$70k
Rbw - scope of work: proposed work is for the construction of a new transportable unit (s1236r-2-14), the unit will include two bedrooms, one bathrm, a living area, & a kitchen. Note: factory buil
- Alterations and additions$40k
New bathrm in existing dwg
- Minor dwellings and sleepouts$250k
New sleepout & additions to existing dwg
- New homes$50k
Rbw - proposed work is for the construction of a new transportable unit (s10729l-2), the unit will include one bdrm, one bathrm, a living area, & a kitchen.
- New commercial buildings$95k
Rbw - scope of work: proposed work is for the construction of a new transportable unit (s135r-1-12), the unit will include 3 bedrooms, one bathrm, a living area, & a kitchen. Note: factory build o
- New homes$70k
Rbw - scope of work: proposed new unit with a bdrm, a bathrm, living area & kitchen.
- Fires and heating$2,000
F/s in alcove woodsman Tarras mk3 dry
ResidentialCommercial The dots are this page of the list.
Near Claudelands
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.