Building consents
Commercial building consents in Western Heights
Below: 1 commercial consents we hold in Western Heights, searchable and on the map.
Commercial consents on record in Western Heights
Individual building consents we hold, each on its property: 1 from 1 Mar 2024 to 1 Mar 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations1
typically $86k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
1 consent
- Commercial alterations$86k
Rbw construction of a free standing gge 6m x 5.8m. Timber framed on engineered designed suspended timber floor. Construction of small 3.4 x 1.8m office add fixed to existing residence. Materials to match existing house. Plus storm water di
ResidentialCommercial The dots are this page of the list.
Near Western Heights
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.