Building consents

Residential building consents in Saint Leonards

Below: 102 residential consents we hold in Saint Leonards, searchable and on the map.

Consents we hold10215 in the last 12 monthsSearch them ↓

Residential consents on record in Saint Leonards

Individual building consents we hold, each on its property: 102 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating25

    3 in the last 12 months · typically $5,500

  2. Alterations and additions17

    4 in the last 12 months · typically $40k

  3. New homes9

    4 in the last 12 months · typically $391k

  4. Other new buildings3

    1 in the last 12 months · typically $190k

  5. Multiple homes2

    1 in the last 12 months · typically $1.1m

  6. Relocated buildings2

    1 in the last 12 months · typically $110k

  7. Garages, sheds and carports2

    typically $34k

  8. Repairs, recladding and strengthening1

    1 in the last 12 months · typically $30k

  9. Plumbing, drainage and wastewater1

    typically $20k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01234202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 1April 2024: 1May 2024: 0June 2024: 0July 2024: 2August 2024: 1September 2024: 0October 2024: 0November 2024: 1December 2024: 1January 2025: 1February 2025: 0March 2025: 0April 2025: 1May 2025: 1June 2025: 2July 2025: 1August 2025: 0September 2025: 0October 2025: 2November 2025: 1December 2025: 1January 2026: 0February 2026: 2March 2026: 2April 2026: 4May 2026: 0June 2026: 1July 2026: 4August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $1.2mThree blocks of two-storey 2-unit duplex townhouses on concrete slabs & timber framing with brick & fibre cement cladding. 608 Queen Street West
  2. $550kConstruct a new three bdrm dwg 313 Townshend Street
  3. $450kThree bdrm dwg. 309A Lovedale Road
  4. $386k3 bdrm dwg 607 Pepper Street
  5. $350kNew 3 bdrm dwg & alterations to existing dwg. 307 Lovedale Road

102 consents

  1. Alterations and additions$150k

    Alterations to dwg - kitchen & bathrm.

    717 Methuen Street · 1 Jul 2026 · ABA20260260

  2. Alterations and additions$100k

    Living add to existing house

    621A Avenue Road West · 1 Jul 2026 · ABA20260476

  3. Multiple homes$1.2m

    Three blocks of two-storey 2-unit duplex townhouses on concrete slabs & timber framing with brick & fibre cement cladding.

    608 Queen Street West · 1 Jul 2026 · ABA20260566

  4. New homes$450k

    Three bdrm dwg.

    309A Lovedale Road · 1 Jul 2026 · ABA20260591

  5. Relocated buildings$200k

    Multi unit relocation - 4 x relocate 3 bdrm dwgs - bearers down.

    111 Stortford Street · 1 Jun 2026 · ABA20260324

  6. New homes$550k

    Construct a new three bdrm dwg

    313 Townshend Street · 1 Apr 2026 · ABA20260150

  7. Alterations and additions$32k

    Alterations to dwg - remove wall & relocate kitchen.

    1010 Pukatea Street · 1 Apr 2026 · ABA20260269

  8. Repairs, recladding and strengthening$30k

    Alteratons to dwg - partial repile.

    502A Charles Street · 1 Apr 2026 · ABA20260286

  9. Fires and heating$6,500

    Replace solid fuel heater - metro smart insert.

    302 Tomoana Road · 1 Apr 2026 · ABA20260333

  10. New homes$386k

    3 bdrm dwg

    607 Pepper Street · 1 Mar 2026 · ABA20260131

  11. Fires and heating$5,500

    Install metro eco tiny rad on base & corner tiled ash floor protector

    210 Lovedale Road · 1 Mar 2026 · ABA20260218

  12. New homes$350k

    New 3 bdrm dwg & alterations to existing dwg.

    307 Lovedale Road · 1 Feb 2026 · ABA20260030

  13. Alterations and additions$5,000

    Alterations to dwg - tiled shower.

    416 Lascelles Street · 1 Feb 2026 · ABA20260113

  14. Other new buildings$60k

    2 x new module buildings, bearers down timber pile foundations, internal plumbing work, kitchen, & drainage.

    · 1 Dec 2025 · ABA20250970

  15. Fires and heating$5,400

    Alt to dwg - installation of a masport Rangitata, insert, dry woodburner, cac 203666

    111 Beresford Street · 1 Nov 2025 · BCN/2025/8910

  16. New homes$500k

    New 4 bdrm dwg with attached gge.

    607 Pepper Street · 1 Oct 2025 · ABA20250853

  17. Alterations and additions$12k

    To supply & install a 180l solahart hot water system with one panel on roof

    1/408 McLean Street · 1 Oct 2025 · ABA20250878

  18. Fires and heating$6,500

    Replace solid fuel heater - firenzo kompact diva insert.

    608 Charles Street · 1 Jul 2025 · ABA20250624

  19. Alterations and additions$150k

    Alterations to dwg.

    309B Lovedale Road · 1 Jun 2025 · ABA20250420

  20. Fires and heating$5,000

    Replace solid fuel heater - metro eco smart insert.

    211 Nikau Street · 1 Jun 2025 · ABA20250481

  21. Fires and heating$5,500

    Install metro eco xtreme rad on leg base & corner ash floor protector 1100x1100x1300

    410 Lascelles Street · 1 May 2025 · ABA20250367

  22. Fires and heating$5,500

    Replace existing woodburner with metro eco smart insert on insulated hearth 380mm deep x 30mm high

    1006 Plunket Street · 1 Apr 2025 · ABA20250251

  23. Fires and heating$7,000

    Metro mega rad woodburner detached dwg

    613 Avenue Road West · 1 Jan 2025 · 24/0156

  24. Alterations and additions$40k

    Re pile existing house

    302 Townshend Street · 1 Dec 2024 · ABA20241026

  25. Alterations and additions$15k

    Ensuite add/alt

    607 Charles Street · 1 Nov 2024 · ABA20240985

ResidentialCommercial The dots are this page of the list.

Near Saint Leonards

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.