Building consents
Building consents in Herbertville
Below: 15 consents we hold in Herbertville, searchable and on the map.
Consents on record in Herbertville
Individual building consents we hold, each on its property: 15 from 1 Oct 2023 to 1 Sep 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions7
4 in the last 12 months · typically $55k
- Fires and heating3
1 in the last 12 months · typically $6,000
- New homes2
2 in the last 12 months · typically $953k
- Commercial alterations1
1 in the last 12 months · typically $175k
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $85k
- Repairs, recladding and strengthening1
1 in the last 12 months · typically $12k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.7mRbw-construction of two two-storey & one three-storey detached houses in lot 1, 2 & 3, each comprising four bedrooms, 2.5 bathrooms & internal garages(single or dbl). Includes stormwater tank 80 Seaview Road, Herbertville
- $600kRbw - internal alterations & extension to existing dwg including new dbl-glazed joinery, new carport & entry canopy extension, new basement extension (below lower floor above), balcony ref 47 Seaview Road, Herbertville
- $250kDwg (new) - 1 bdrm dwg 78 Seaview Road, Herbertville
- $175kRbw - add of attic to include bdrm, office & bathrm & balcony extension of existing deck. 67 Seaview Road, Herbertville
- $95kRbw - new dressing room additions & alterations. 97 Seaview Road, Herbertville
15 consents
- Fires and heating$5,000
Install replacement freestanding woodfire & flue into existing fireplace - woodsman kanuku ped
- Repairs, recladding and strengthening$12k
Rbw - roof strengthening works are proposed to accommodate the installation of solar panels by providing new underpulins & supporting posts. The existing lightweight roof cladding will be removed an
- Alterations and additions$55k
Bearers down consent, foundations & services only
- Decks, pergolas and verandahs$85k
Rbw - new conservatory add with membrane & roof glazing.
- Alterations and additions$95k
Rbw - new dressing room additions & alterations.
- New homes$250k
Dwg (new) - 1 bdrm dwg
- Alterations and additions$45k
Rbw - three ensuite renovations on the upper floor using existing drainage stacks with new sanitary fixtures, wet area waterproofing & tiling.
- New homes$1.7m
Rbw-construction of two two-storey & one three-storey detached houses in lot 1, 2 & 3, each comprising four bedrooms, 2.5 bathrooms & internal garages(single or dbl). Includes stormwater tank
- Commercial alterations$175k
Rbw - add of attic to include bdrm, office & bathrm & balcony extension of existing deck.
- Alterations and additions$600k
Rbw - internal alterations & extension to existing dwg including new dbl-glazed joinery, new carport & entry canopy extension, new basement extension (below lower floor above), balcony ref
- Alterations and additions$10k
Ensuite upgrade. Detached dwg.
- Fires and heating$6,000
Install replacement freestanding woodfire & flue - kent Ruapehu.
- Fires and heating$6,800
Installation of solid wood burner (metro smart insert)
- Alterations and additions$18k
Rbw - minor alterations to an existing home. The works will include the add of a new ensuite in the lower bdrm level, & a new door opening to the bathrm on the upper level.
- Alterations and additions$180k
Rbw - add/alt. New 2 bdrm, bathrm & family room add to the rear of existing house. Minor internal changes to existing single storey dwg. New deck to St elevation.
ResidentialCommercial The dots are this page of the list.
Suburbs in Herbertville
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.