Building consents
Building consents in Himatangi Beach
Below: 109 consents we hold in Himatangi Beach, searchable and on the map.
Consents on record in Himatangi Beach
Individual building consents we hold, each on its property: 109 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating17
2 in the last 12 months · typically $7,000
- Alterations and additions10
2 in the last 12 months · typically $40k
- Garages, sheds and carports7
typically $35k
- New homes5
1 in the last 12 months · typically $550k
- Relocated buildings5
1 in the last 12 months · typically $34k
- Plumbing, drainage and wastewater5
1 in the last 12 months · typically $3,000
- Minor dwellings and sleepouts4
1 in the last 12 months · typically $28k
- Multiple homes3
typically $900k
- Repairs, recladding and strengthening1
typically $240k
- Commercial alterations1
typically $60k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $940kNew 2 storey 3 bdrm dwg on timber piles 7 Koputara Road, Himatangi Beach
- $250kRelocate yard built 'shell' building & relocate existing gge to rear of property 80 Himatangi Street, Himatangi Beach
- $40kLower floor joists under new level entry shower plus other internal alterations 103 Koputara Road, Himatangi Beach
- $40kConstruct outbuilding with bathrm & laundry 70 Koputara Road, Himatangi Beach
- $30kTurning part of a consented sleepout into an ensuite & kitchenette with associated plumbing. 54 Koputara Road, Himatangi Beach
109 consents
- New homes$940k
New 2 storey 3 bdrm dwg on timber piles
- Alterations and additions$40k
Lower floor joists under new level entry shower plus other internal alterations
- Fires and heating$7,000
To supply & install a new metro micro woody freestanding fire into a batch
- Fires and heating$9,800
Installation of yunca ruby uleb fire, flue system & flashing
- Relocated buildings$250k
Relocate yard built 'shell' building & relocate existing gge to rear of property
- Plumbing, drainage and wastewater$3,000
New sewer drains from existing house gully trap to new mdc installed sewer pump station at edge of boundary
- Minor dwellings and sleepouts$30k
Turning part of a consented sleepout into an ensuite & kitchenette with associated plumbing.
- Alterations and additions$40k
Construct outbuilding with bathrm & laundry
- Alterations and additions$90k
Alterations to existing residence including new roof & closing in covered area. Form new kitchen & laundry layout. Convert gge into bdrm with ensuite & walk-in-robe. Additions including new gge & new laundry to rear of residence.
- Alterations and additions$101k
Constructing a 9 metre x 13 metre fully enclosed poleshed with 2 roller doors & 2 aluminum sliding doors
- Minor dwellings and sleepouts$25k
Install plumbing & drainage to create an ensuite & laundry within the existing gge / sleepout
- Fires and heating$5,000
Install freestanding wood burner & flue kit as per manufactures specifications
- New homes$900k
Rbw - new three storey dwg with five bedrooms, 3.5 bathrooms & attached gge. New retaining walls.
- Fires and heating$7,000
Install a new metro tiny rad woody on new hearth & standard flue kit
- New homes$550k
Single level four-bdrm dwg with brick veneer cladding, rectangle shaped with full-length gable pitch roof.
- Garages, sheds and carports$100k
P2 - large shed with approximately 220m2 converted into a dwg with 2 bathrooms & a kitchen, p1 - large shed with one bathrm
- Alterations and additions$30k
Ground floor bathrm alterations
- Garages, sheds and carports$24k
Totalspan 6m x 4m x 2.4m shed
- Fires and heating$8,500
Installation of a woodsman flare pedestal fire, flue system & flashing
- Fires and heating$6,100
To remove old wood burner fireplace. Then install a kinmont 350 (ped) to manufactured specifications in its place.
- Fires and heating$7,500
Installation of maxen kinmont 350-w woodfire, flue system & flashing
- Alterations and additions$70k
Upgrading external cladding & window & door replacement throughout.
- Fires and heating$8,200
Installation of maxen kinmont 450-p woodfire, flue system & flashing
- Fires and heating$7,000
Install a metro smart insert wood fire into existing chimney cavity with new flue kit
- Multiple homes$600k
Rbw - housing (multi-unit dwg) - 2 x new two-storey, 3-bdrm townhouses (units 23 & 24)
ResidentialCommercial The dots are this page of the list.
Suburbs in Himatangi Beach
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.