Building consents
Building consents in Awatuna
Below: 8 consents we hold in Awatuna, searchable and on the map.
Consents on record in Awatuna
Individual building consents we hold, each on its property: 8 from 1 Aug 2021 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes3
typically $389k
- Fires and heating2
1 in the last 12 months · typically $5,001
- Garages, sheds and carports1
1 in the last 12 months · typically $61k
- Relocated buildings1
typically $48k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $61kNew car port (pole shed) & new laundry tub adjacent to existing house. 39 Ballarat Rise
- $10kInstallation of a woodsman stag space heater & flue 649B Kumara Junction Highway
8 consents
- Fires and heating$10k
Installation of a woodsman stag space heater & flue
- Garages, sheds and carports$61k
New car port (pole shed) & new laundry tub adjacent to existing house.
- New homes$100k
2-bdrm dwg on driven timber piles.
- Fires and heating$1
To build new 3 bdrm home including woodsman Tarras space heater amendment 1: changing the rigid air barrier from ibs rigid wrap to james hardie 6mm rab board system. To build new 3 bdrm home including woodsman Tarras space heater
- New homes$389k
New single level, three bdrm, 1 bathrm dwg with woodsman kanaku fire (dry) & on-site effluent disposal system
- Relocated buildings$48k
Relocation of cottage to be recladding & new fire - 123 von loop Rd, Mount Nicholas station
- New homes$389k
Erect 3 bdrm dwg & install septic system
- Alterations and additions$6,000
Installation of a stag wet multifuel fire to a domestic dwg
ResidentialCommercial The dots are this page of the list.
Near Awatuna
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.