Building consents
Building consents in Waikokowai
Below: 10 consents we hold in Waikokowai, searchable and on the map.
Consents on record in Waikokowai
Individual building consents we hold, each on its property: 10 from 1 Apr 2020 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports2
1 in the last 12 months · typically $136k
- Fires and heating1
1 in the last 12 months · typically $8,287
- Alterations and additions1
typically $20k
- Decks, pergolas and verandahs1
typically $30k
- Plumbing, drainage and wastewater1
typically $80k
- Pools and spas1
typically $10k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $71kGge 428 Waikokowai Road
- $8,287Heater 3 McDonald Mine Road
10 consents
- Garages, sheds and carports$71k
Gge
- Fires and heating$8,287
Heater
- Plumbing, drainage and wastewater$80k
Foundations, on-site effluent system, stormwater disposal system, & associated connections for an re-sited dwg
- Pools and spas$10k
Pool + fencing
- Decks, pergolas and verandahs$30k
Demolition & re-construction of existing tiled deck. New ancillary
- Garages, sheds and carports$200k
Gge add & internal alterations creating a new detached dwg
- Alterations and additions$20k
Remove bathrm fixtures in ensuite & bathrm. Re-gib, detached dwg
- Relocated buildings$295k
New relocatable building & to connect to existing res dwg
- Alterations and additions$15k
Renovation to bathrm upgrading acrylic shower to tiled detached dwg
- Fires and heating$6,500
Replace existing woodburner with a new firenzo encore dwg
ResidentialCommercial The dots are this page of the list.
Near Waikokowai
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.