Consents in the last five years by the kind of work their description names.

  1. Fires and heating24

    7 in the last 12 months · typically $5,832

  2. New homes15

    6 in the last 12 months · typically $560k

  3. Pools and spas10

    2 in the last 12 months · typically $58k

  4. Alterations and additions9

    2 in the last 12 months · typically $70k

  5. Relocated buildings4

    1 in the last 12 months · typically $63k

  6. Plumbing, drainage and wastewater2

    2 in the last 12 months · typically $22k

  7. Repairs, recladding and strengthening2

    1 in the last 12 months · typically $213k

  8. Garages, sheds and carports2

    typically $40k

  9. Multiple homes1

    typically $800k

  10. Minor dwellings and sleepouts1

    typically $1m

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01234202420252026November 2023: 0December 2023: 2January 2024: 0February 2024: 0March 2024: 0April 2024: 1May 2024: 1June 2024: 0July 2024: 0August 2024: 2September 2024: 0October 2024: 1November 2024: 2December 2024: 1January 2025: 2February 2025: 1March 2025: 2April 2025: 0May 2025: 1June 2025: 2July 2025: 3August 2025: 1September 2025: 0October 2025: 1November 2025: 1December 2025: 1January 2026: 0February 2026: 3March 2026: 0April 2026: 1May 2026: 4June 2026: 4July 2026: 2August 2026: 2September 2026: 3October 2026: 0

Largest in the last 12 months

  1. $1.5mRbw - new single storey home 495m2 with attached gge, swimming pool, kitchen, scullery, 5 bedrooms, two bathrooms, ensuite, raft floor, timber framed walls, longrun roofing, exterior deck, brick ve 2004 Hunua Road, Hūnua
  2. $990kRbw - proposed single level three bdrm dwg with attached two car gge, septic tank & effluent trenches, water tanks & on roof solar power panels 150 Skyhigh Road, Hūnua
  3. $833kRbw- to construct a 4-bdrm home, 2 bathrooms, dbl gge. On-site wastewater & stormwater. 74E Broken Bridge Road, Hūnua
  4. $662kRbw - new four-bdrm home, two bathrooms, internal entry gge metal tile roofing linea wb bricks septic system & water tanks. 1739A Ponga Road, Hūnua
  5. $468kConstruction of single storey multi-unit dwg - new homew with self-contained flat 27 Gillespie Road, Hūnua

118 consents

  1. New homes$300k

    Rbw - construction of a new detached minor dwg under 70m2 with two bedrooms, one bathrm & attached gge constructed of sed poles 197m2. Associated drainage & wastewater system.

    1629A Ponga Road, Hūnua · 1 Sep 2026 · BCO10415119

  2. New homes$662k

    Rbw - new four-bdrm home, two bathrooms, internal entry gge metal tile roofing linea wb bricks septic system & water tanks.

    1739A Ponga Road, Hūnua · 1 Sep 2026 · BCO10416624

  3. Plumbing, drainage and wastewater$4,135

    This is for a new septic tank installation to service a new non-permanent unit. Supply & install re sidential treatment system (see quotes) approx. 130m pcdi field 100

    35 McMurray Road, Hūnua · 1 Sep 2026 · BCO10417214

  4. Relocated buildings$20k

    Rbw - timber pile foundation for relocated dwg. Private drainage, 2x 25,000l tanks & effluent disposal

    93 Cowan Road, Hūnua · 1 Aug 2026 · BCO10411283

  5. New homes$990k

    Rbw - proposed single level three bdrm dwg with attached two car gge, septic tank & effluent trenches, water tanks & on roof solar power panels

    150 Skyhigh Road, Hūnua · 1 Aug 2026 · BCO10416066

  6. Repairs, recladding and strengthening$75k

    Rbw - reclad - partial re-clad to existing two level dwg (flat 1) with new bevel back weatherboard cladding over cavity (east elevation only), existing windows to be refurbished/reused. New timbe

    2284C Hunua Road, Hūnua · 1 Jul 2026 · BCO10413306

  7. Fires and heating$9,066

    Installation of solid fuel heater to manufacturers specification (firenzo contessa)

    2826B Hunua Road, Hūnua · 1 Jul 2026 · BCO10414970

  8. Fires and heating$7,000

    Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications - woodsman serene uleb wood fire replaces existing fire.

    1729 Ponga Road, Hūnua · 1 Jun 2026 · BCO10413265

  9. Pools and spas$8,500

    Installation of new ringfenced pool fencing & gate. Fibreglass inground pool under 35,000 litres (18,000 litres) exempt from cons ent - exemption 23 of schedule 1.

    74E Broken Bridge Road, Hūnua · 1 Jun 2026 · BCO10413741

  10. Fires and heating$4,500

    Installation of a secondhand woodsman Tarras mkiii woodburner.

    79 Paparimu Road, Hūnua · 1 Jun 2026 · BCO10413918

  11. Fires and heating$8,791

    Installation of solid fuel heater to manufacturers specification (firenzo encore)

    1628B Ararimu Road, Hūnua · 1 Jun 2026 · BCO10414220

  12. Plumbing, drainage and wastewater$40k

    Rbw - construction of new foundations & drainage system for two relocated shed, new onsite wastewater system

    380 Jones Road, Hūnua · 1 May 2026 · BCO10406494

  13. New homes$1.5m

    Rbw - new single storey home 495m2 with attached gge, swimming pool, kitchen, scullery, 5 bedrooms, two bathrooms, ensuite, raft floor, timber framed walls, longrun roofing, exterior deck, brick ve

    2004 Hunua Road, Hūnua · 1 May 2026 · BCO10406514

  14. Fires and heating$9,000

    Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications firenzo contessa rural wood fire replaces existing fire

    85 Heald Road, Hūnua · 1 May 2026 · BCO10411880

  15. Fires and heating$5,000

    Installation of a new masport Wanaka woodburner

    52 Lockwood Road, Hūnua · 1 May 2026 · BCO10413175

  16. Pools and spas$10k

    Installation of ring fenced pool fencing & gates. Fibreglass inground pool under 35,000 litres, exempt from consent - exemption 23 of schedule 1

    73 Sowerby Heights, Hūnua · 1 Apr 2026 · BCO10410059

  17. Alterations and additions$90k

    Alt/add to south/west of existing bdrm 2 to form a new housing - detached

    198 Jones Road, Hūnua · 1 Feb 2026 · 26/0099

  18. New homes$833k

    Rbw- to construct a 4-bdrm home, 2 bathrooms, dbl gge. On-site wastewater & stormwater.

    74E Broken Bridge Road, Hūnua · 1 Feb 2026 · BCO10406687

  19. Fires and heating$9,000

    Sfh fixed fee: replacing old insert woodfire with firenzo kompact forte

    1101 Ponga Road, Hūnua · 1 Feb 2026 · BCO10408556

  20. New homes$468k

    Construction of single storey multi-unit dwg - new homew with self-contained flat

    27 Gillespie Road, Hūnua · 1 Dec 2025 · BC251414

  21. Alterations and additions$17k

    Rbw - new ensuite to be installed within the existing bdrm 4 area.

    2482 Hunua Road, Hūnua · 1 Nov 2025 · BCO10403503

  22. Pools and spas$8,500

    Installation of new ringfenced fibreglass inground pool under 35,000 litres, exempt from consent - exemption 23 of schedule 1.

    444C Peach Hill Road, Hūnua · 1 Oct 2025 · BCO10402991

  23. Multiple homes$800k

    Construction of 2 detached dwgs with attached garages

    51 Middleton Road, Hūnua · 1 Aug 2025 · BCN/2025/4872

  24. Alterations and additions$100k

    Rbw - scullery, wc, laundry & bathrm in ground floor. Bathrm, ensuite & walk-in-wardrobe in first floor. Internal alterations only.

    300 Hunua Road, Hūnua · 1 Jul 2025 · BCO10398010

  25. Fires and heating$3,000

    Installation of new replacement free standing wood burner & flue system

    150 Jones Road, Hūnua · 1 Jul 2025 · BCO10398632

ResidentialCommercial The dots are this page of the list.

Suburbs in Hunua

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Auckland Council.