Building consents
Building consents in Inglewood
Below: 301 consents we hold in Inglewood, searchable and on the map.
Consents on record in Inglewood
Individual building consents we hold, each on its property: 301 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating65
13 in the last 12 months · typically $5,000
- New homes43
11 in the last 12 months · typically $462k
- Alterations and additions40
8 in the last 12 months · typically $44k
- Garages, sheds and carports26
5 in the last 12 months · typically $50k
- Relocated buildings11
2 in the last 12 months · typically $100k
- Plumbing, drainage and wastewater9
2 in the last 12 months · typically $4,000
- Repairs, recladding and strengthening6
2 in the last 12 months · typically $48k
- Minor dwellings and sleepouts5
1 in the last 12 months · typically $71k
- Multiple homes5
typically $1m
- Commercial alterations3
1 in the last 12 months · typically $62k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.3mStage 2 - main building consent package - res multi unit res dwgs within lot 31 & relevant stormwater & civil design for the development. Also includes structural design packages & landscape architecture drawings 5 Kahikatea Street, Inglewood
- $1mRes/farm - four bdrm dwg with attached gge 42 Lepper Road Lower, Inglewood
- $855kNew dwg 62 Konini Street, Inglewood
- $650kConstruct new dwg housing - detached 14 Hodge Park Lane, Inglewood
- $547kThree bdrm res dwg 47C Maire Street, Inglewood
301 consents
- New homes$855k
New dwg
- New homes$650k
Construct new dwg housing - detached
- Alterations and additions$2,000
Structurally engineered pile depth reviewed & reduced to for or value engineering, add of firewood hatch, updated bracing plan to suit onsite framing., ceiling insulation revised exterior fireplace cladding change additional driveway + soak p
- Garages, sheds and carports$140k
Construct a 16m x 9m x 3.6m gge with washroom.
- Garages, sheds and carports$51k
3-bay pole gge shed.
- Fires and heating$5,000
Replacement of woodfire & flue with masport Kaituna pedestal freestanding wood fire.
- Fires and heating$5,000
Installation of metro logfire
- Fires and heating$7,400
Installation of metro eco xtreme rad base ,eco fluekit ,flueshield on ash floor protector
- Fires and heating$5,000
Installation of a pyro classic woodfire
- New homes$2.3m
Stage 2 - main building consent package - res multi unit res dwgs within lot 31 & relevant stormwater & civil design for the development. Also includes structural design packages & landscape architecture drawings
- Minor dwellings and sleepouts$1,200
Minor plumbing to a studio.
- Fires and heating$2,600
Removal of gas heater & flue, replaced with kent Cardrona log burner & flue.
- Fires and heating$5,000
Installation of a maxen kinmont 450p wood fire
- Fires and heating$6,000
Install maxen cargill 350 freestanding wood fire.
- Garages, sheds and carports$50k
Gge/shed - no services totalspan 8m x 6.5m x 2.4m shed
- New homes$243k
Two bdrm dwg
- Relocated buildings$32k
To relocate dwg to lot 2 (rear site) - foundations & services. Also to install new 180l hwc
- Fires and heating$5,000
Replacement of woodfire & flue
- Alterations and additions$5,000
New bathrm ground floor
- Repairs, recladding and strengthening$55k
Re-located house on new sed piles. New external plumber & stormwater disposal.
- Fires and heating$3,000
Install free standing metro xtreme rad leg wood fire
- Alterations and additions$30k
Housing (detached dwg) - new sprinkler system including watertank & pump
- Fires and heating$7,500
Freestanding - metro tiny rad woody free standing wood burner
- Garages, sheds and carports$250k
Res/farm - alterations & additions to existing dwg & gge.
- Alterations and additions$180k
Add & alterations to existing house with revised kitchen & laundry. No new habitable rooms.
ResidentialCommercial The dots are this page of the list.
Suburbs in Inglewood
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.