Building consents
Commercial building consents in Invercargill
Below: 52 commercial consents we hold in Invercargill, searchable and on the map.
Commercial consents on record in Invercargill
Individual building consents we hold, each on its property: 52 from 1 Feb 2020 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations24
4 in the last 12 months · typically $40k
- New commercial buildings11
2 in the last 12 months · typically $355k
- Fit-outs3
1 in the last 12 months · typically $20k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kConstruction of new res dwg in sph factory. 2 bdrm, 1 bathrm unit based off sph glasgow design to be transported & installed on site under different consent 32 Robertson Street, Richmond
- $230kConstruction of a new res dwg in sph factory. 2 bdrm, 1 bathrm unit based off sph Sefton design. Includes installation of a woodsman coleridge ultra-low emission burner. To be transported & installed on site under different consen 32 Robertson Street, Richmond
- $75kRe-roof & reline workshop 488 Queens Drive, Rosedale
- $75kConstruct gge with workshop / games room 100 Martin Street, Strathern
- $50kConstruct 4 bay shed with workshop 273 Bainfield Road, Waihopai
52 consents
- Commercial alterations$75k
Construct gge with workshop / games room
- Commercial alterations$50k
Construct 4 bay shed with workshop
- Commercial alterations$16k
Add of office, coffee station, bathrm & f/s woodsman tarris ii solid fuel burner
- Fit-outs$20k
Retail fit-out for Mum's Chicken (Meridian Mall - tenancy 106)
- New commercial buildings$230k
Construction of a new res dwg in sph factory. 2 bdrm, 1 bathrm unit based off sph Sefton design. Includes installation of a woodsman coleridge ultra-low emission burner. To be transported & installed on site under different consen
- New commercial buildings$300k
Construction of new res dwg in sph factory. 2 bdrm, 1 bathrm unit based off sph glasgow design to be transported & installed on site under different consent
- Commercial alterations$75k
Re-roof & reline workshop
- New commercial buildings$440k
South Peak Homes 'Turnbull Series' to be fabricated from bearers up, in South Peak Homes factory Westport fireplace & internal tiling will be completed & consented onsite aplication (ie not installed prior to transportation)
- Commercial alterations$5,200
Internal alterations to add office & scullery
- New commercial buildings$310k
Construction of new res dwg in sph factory. 3 bdrm room, 1 bathrm unit based off SPH Coronet design to be transported & installed on site under different consent
- Commercial alterations$65k
Construct storage shed with office & bathrm
- Commercial alterations$85k
Construct gge with office & bathrm
- New commercial buildings$355k
Construction of a three-bdrm, two-bathrm transportable dwg constructed in the south peak homes Westport factory.
- Commercial alterations$40k
New gge with home office miscellaneous
- Commercial alterations$109k
Rbw bathrm & internal alterations to kitchen, scullery, dining & office
- New commercial buildings$234k
Fabrication of a SPH Buckland in our Westport factory to be transported to site (Methven) upon completion. Site consent has been sought via Mackenzie District council
- Commercial alterations$65k
Rbw extension to gge to add workshop
- New commercial buildings$355k
Construction of a three-bdrm, two-bathrm, living, dining & laundry south peak homes dwg 'turnbull' design constructed in sph Westport factory, to be transported to Grey District on completion. A separate site consent will be sought throug
- Commercial alterations$5,000
Rbw internal alt - kitchen/lounge/hall to remove walls
- New commercial buildings$359k
Blacktop: construction of a new transportable two-bdrm, one-bathrm res dwg with open plan living constructed at south peak homes factory. The dwg will be transported to site, placed on piles & connected to on-site services.
- Commercial alterations$230k
Rbw construct 3 bay shed with bathrm, kitchen & office
- Commercial alterations$60k
Construct a new raised roof section within existing roof area of gge/workshop & extend existing blockwall height
- New commercial buildings$502k
Construction of a new two-bdrm transportable dwg (turnball) constructed at south peak homes factory, to be transported to site upon completion. Site works consent will be sought form Marlborough District dc.
- New commercial buildings$280k
Pre-fabrication of a 2 bdrm home in our Westport factory (South Peak Homes Glasgow). Foundation & siteworks will be on a separate consent.
- Commercial alterations$140k
Construct shed with bathrm & office
ResidentialCommercial The dots are this page of the list.
Suburbs in Invercargill
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.