Building consents
Residential building consents in Glengarry
Below: 254 residential consents we hold in Glengarry, searchable and on the map.
Residential consents on record in Glengarry
Individual building consents we hold, each on its property: 254 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating56
11 in the last 12 months · typically $5,000
- Alterations and additions36
7 in the last 12 months · typically $7,750
- Garages, sheds and carports19
1 in the last 12 months · typically $40k
- Insulation13
2 in the last 12 months · typically $90k
- New homes8
2 in the last 12 months · typically $485k
- Multiple homes5
typically $690k
- Minor dwellings and sleepouts3
1 in the last 12 months · typically $88k
- Repairs, recladding and strengthening3
typically $100k
- Plumbing, drainage and wastewater3
typically $12k
- Decks, pergolas and verandahs2
typically $2,501
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.5mR3 - 5 x three storey townhouse 41 Derwent Street
- $700kConstruction of a new dwg with a detached gge, installation of a woodsman serene (uleb) dry freestanding woodburner - cac194586, subject to section 73 notice 66 Carnarvon Street
- $117kRbw construct sleepout incl. Kitchenette & bathrm 142 Crawford Street
- $90kInternal alterations with insulation, cladding to external walls & re-roof 235 St Andrew Street
- $75kInternal alterations with insulation & cladding to external walls 239 St Andrew Street
254 consents
- Fires and heating$4,500
Install f/s metro wee rad solid fuel burner
- Alterations and additions$13k
Rbw internal alterations to remove wall
- Fires and heating$5,800
Install f/s yunca oscar solid fuel burner
- Fires and heating$5,000
Install f/s maxen kinmont 350-p solid fuel burner (replacement)
- Alterations and additions$1
Amend entry, cladding, pre-nail & as built foundation
- Alterations and additions$1
Rbw entrance cladding product changed
- Fires and heating$8,500
Install f/s woodsman petite serene solid fuel burner
- Fires and heating$6,000
Install scandia cascade leb f/s solid fuel burner
- Insulation$90k
Internal alterations with insulation, cladding to external walls & re-roof
- Insulation$75k
Internal alterations with insulation & cladding to external walls
- Fires and heating$6,000
Installation of a solid fuel heater to manufacturers specifications - maxen kinmont 350l replaces existing fire.
- Fires and heating$6,000
Install f/s masport r1200 solid fuel burner (replacement)
- Fires and heating$4,000
F/s woodsman coleridge legs sfh
- Alterations and additions$1
Durability modification amendment
- Fires and heating$5,000
Install f/s maxen kinmont solid fuel burner (replacement)
- New homes$2.5m
R3 - 5 x three storey townhouse
- Alterations and additions$32k
Rbw extension to living
- Alterations and additions$1
Durability modification
- Fires and heating$10k
Install inbuilt yunca xander solid fuel burner (replacement)
- Fires and heating$5,000
Install insert maxen Forbury solid fuel burner (replacement)
- Minor dwellings and sleepouts$117k
Rbw construct sleepout incl. Kitchenette & bathrm
- Garages, sheds and carports$30k
Rbw construct attached gge with laundry
- New homes$700k
Construction of a new dwg with a detached gge, installation of a woodsman serene (uleb) dry freestanding woodburner - cac194586, subject to section 73 notice
- Alterations and additions$30k
Rbw bathrm / laundry alterations
- Fires and heating$5,900
Install f/s masport Kaituna solid fuel burner (replacement)
ResidentialCommercial The dots are this page of the list.
Near Glengarry
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.