Building consents
Building consents in Seaward Bush
Below: 92 consents we hold in Seaward Bush, searchable and on the map.
Consents on record in Seaward Bush
Individual building consents we hold, each on its property: 92 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes25
9 in the last 12 months · typically $534k
- Garages, sheds and carports17
typically $50k
- Fires and heating10
3 in the last 12 months · typically $7,000
- Alterations and additions6
1 in the last 12 months · typically $2,800
- Plumbing, drainage and wastewater2
typically $35k
- Decks, pergolas and verandahs2
typically $153k
- Minor dwellings and sleepouts1
typically $3,000
- Commercial alterations1
typically $230k
- Repairs, recladding and strengthening1
typically $150k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $680kRbw construct 4 bdrm dwg with attached gge & insert yunca xander solid fuel burner 58 Dairy Way
- $612kRbw construct 4 bdrm dwg with attached gge & f/s yunca monte eurosolid fuel burner 53 McKellar Road
- $562kRbw construct 4 bdrm dwg with attached gge & f/s yunca monte solid fuel burner 348 Mason Road
- $520kRbw construct 4 bdrm dwg with attached gge 21 Majestic Chance
- $510kRbw construct 3 bdrm dwg with attached dbl gge 28 Glenda Place
92 consents
- New homes$500k
Rbw construct 4 bdrm dwg with attached gge & f/s woodsman coaster solid fuel burner
- New homes$465k
Rbw construct 2 bdrm dwg with attached shed & install f/s yunca monte euro (wetback) solid fuel burner
- New homes$680k
Rbw construct 4 bdrm dwg with attached gge & insert yunca xander solid fuel burner
- New homes$612k
Rbw construct 4 bdrm dwg with attached gge & f/s yunca monte eurosolid fuel burner
- New homes$510k
Rbw construct 3 bdrm dwg with attached dbl gge
- New homes$562k
Rbw construct 4 bdrm dwg with attached gge & f/s yunca monte solid fuel burner
- Fires and heating$42k
Rbw internal alterations to kitchen & relocate f/s masport r3000p solid fuel burner (reconditioned)
- New homes$400k
Rbw construct 1 bdrm dwg with attached pole shed
- Alterations and additions$16k
Rbw relocate rear entrance
- New homes$520k
Rbw construct 4 bdrm dwg with attached gge
- Fires and heating$5,000
Install f/s firenzo contessa ru solid fuel burner (replacement)
- Fires and heating$50k
Add of wc, vanity, insulation & f/s monte euro solid fuel burner
- New homes$325k
Rbw construct 2 bdrm dwg with attached gge
- New homes$550k
Rbw construct 4 bdrm dwg with attached gge
- Fires and heating$5,500
Install f/s metro mega rad solid fuel burner (replacement)
- Decks, pergolas and verandahs$120k
Rbw construct conservatory & covered outdoor area
- Garages, sheds and carports$77k
Construct shed with wc
- Garages, sheds and carports$30k
Construct pole shed
- Fires and heating$8,000
Removal of existing jetmaster open fireplace & replacement with a firenzo topaz leb ru insert fireplace. Existing outer flue casings to be retained with a new 150mm ss flue to fit the topaz fire, an
- Garages, sheds and carports$80k
Rbw extension to add gge
- Decks, pergolas and verandahs$185k
Rbw foundations, access, services & deck
- Alterations and additions$5,000
Coa bathrm alt
- Garages, sheds and carports$45k
Construct shed
- New homes$500k
Rbw construct 3 bdrm dwg with attached gge & f/s maxon kinmont solid fuel burner
- Fires and heating$15k
Rbw internal alt trusses & install f/s woodsman ecr novo solid fuel burner
ResidentialCommercial The dots are this page of the list.
Near Seaward Bush
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.