Building consents
Residential building consents in Matauri Bay
Below: 39 residential consents we hold in Matauri Bay, searchable and on the map.
Residential consents on record in Matauri Bay
Individual building consents we hold, each on its property: 39 from 8 Oct 1993 to 1 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Garages, sheds and carports3
typically $35k
- Alterations and additions2
typically $40k
- Fires and heating2
typically $3,000
- Plumbing, drainage and wastewater1
typically $13k
- New homes1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
39 consents
- Alterations and additions$40k
Foundations for relocatable second-
- Garages, sheds and carports
Construct 600 series versatile garage
- Plumbing, drainage and wastewater$13k
Install onsite wastewater system
- New homes
New Dwelling with attached Garage
- Fires and heating$3,000
Install masport free-standing wood
- Garages, sheds and carports
Dwelling and boat shed
- Alterations and additions
Dwelling
- Garages, sheds and carports$35k
Versatile dbl gge
- Fires and heating$3,000
Install a masport r3000 ped free-St
- Fires and heating$3,000
Install of a masport r1200 leg free
- Alterations and additions$15k
Foundations & steps for relocated
- Relocated buildings
Wolf - Site - Foundations for Prefabricated Relocatable Dwelling, Construct New Deck and Install a New On-Site Wastewater
- Relocated buildings
Foundations for 3 Bedroom Relocatable Dwelling with Onsite Wastewater System
- Garages, sheds and carports
Construct Steel Totalspan Garage/Storage Shed
- New homes
New Dwelling (To replace fire damaged house)
- Plumbing, drainage and wastewater
Replace Failed Wastewater System
- New homes
New Transportable 4 Bedroom Dwelling with Decks and Effluent Disposal System - to be built in Awanui and transported to Matauri Bay Kaeo
- New homes
New Dwelling - Stage 1
- New homes
Construct 3 Bedroom Dwelling with Freestanding Fireplace & On-site Effluent Disposal
- Relocated buildings
Relocate Existing Dwelling, add new Steps. Remove Existing Kitchen & Convert to Bedroom for use as a sleepout
- Retaining walls
Retaining wall.
- New homes
New Single Storey 3 Bedroom Dwelling.
- New homes
New Dwelling with Double Garage
- Other new buildings
NEW LOUNGE AND BASEMENT AREA VNZ
- Relocated buildings
RELOCATED DWELLING
ResidentialCommercial The dots are this page of the list.
Near Matauri Bay
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.