Building consents
Building consents in Kaikohe
Below: 290 consents we hold in Kaikohe, searchable and on the map.
Consents on record in Kaikohe
Individual building consents we hold, each on its property: 290 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating63
16 in the last 12 months · typically $5,000
- New homes43
13 in the last 12 months · typically $468k
- Alterations and additions41
5 in the last 12 months · typically $30k
- Garages, sheds and carports19
1 in the last 12 months · typically $36k
- Relocated buildings14
2 in the last 12 months · typically $93k
- Plumbing, drainage and wastewater12
1 in the last 12 months · typically $20k
- Multiple homes4
typically $2.1m
- Commercial alterations2
1 in the last 12 months · typically $26k
- Decks, pergolas and verandahs2
typically $58k
- Other new buildings2
typically $395k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.1mDwg with wetback fireplace & 29 Signal Station Road, Ōmāpere
- $756kConstruct new 4-bdrm dwg with attached dbl gge detached dwgs 103 State Highway 1, Ōhaeawai
- $734kNew 3 bdrm dwg with attached dbl gge. Detached dwgs 103 State Highway 1, Ōhaeawai
- $696kNew 3 bdrm dwg with dbl gge to be constructed detached dwg. 103 State Highway 1, Ōhaeawai
- $616kConstruct a new 4 bdrm dwg with attached dbl detached dwgs 103 State Highway 1, Ōhaeawai
290 consents
- Relocated buildings$40k
Relocated dwg
- Alterations and additions$300k
Extension to extsting house
- Garages, sheds and carports$35k
Erect gge
- Fires and heating$7,000
Install replacement metro Ltd xtreme rad woodfire - base & flue system.
- Fires and heating$12k
Installation of wood burner
- Alterations and additions$85k
The project comprises a new kitset
- Fires and heating$6,000
Install of a metro smart insert fir
- Fires and heating$6,000
Replacement of a fireplace
- New homes$245k
New single-storey 2 bdrm small stand alone dwg on timber piles with longrun metal roof cladd
- Fires and heating$3,000
Replace existing woodburner
- Fires and heating$6,000
Solid fuel heater - metro insert
- Fires and heating$7,500
Replace existing freestanding solid fuel heater with a metro mega rad leg Ltd.
- New homes$550k
New 4 bdrm dwg with 2 living & 3 car attached gge
- New commercial buildings$360k
Factory consent - dwg
- Fires and heating$8,000
Install of a metro xtreme rad leg c
- Fires and heating$2,000
Remove existing fireplace. Install
- Fires and heating$5,000
Installation of a free-standing maxen kinmont 350-p woodburner & maxen flue kit with dektite acrylead tile flashing smoke alarms interconnected section 2.2 nzs4514:2021 ceiling height 2.4m
- New homes$80k
12744 new 3-bdrm dwelling
- Fires and heating$5,000
Install of a metro wee rad ped ca w
- Commercial alterations$49k
11.0m long x 7.0m wide gge/workshop
- Plumbing, drainage and wastewater$33k
New onsite wastewater management system
- Fires and heating$7,500
Install of a woodsman kanuku free s
- Fires and heating$8,500
Install of a metro wee rad leg free
- Fires and heating$7,500
Install of a metro wee rad leg fire
- New homes$474k
3 bdrm dwg with attached single gge as part of detached dwgs
ResidentialCommercial The dots are this page of the list.
Suburbs in Kaikohe
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.