Building consents

Building consents in Hakaru

Below: 35 consents we hold in Hakaru, searchable and on the map.

Consents we hold355 in the last 12 monthsSearch them ↓

Consents on record in Hakaru

Individual building consents we hold, each on its property: 35 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Relocated buildings5

    2 in the last 12 months · typically $80k

  2. Alterations and additions5

    1 in the last 12 months · typically $85k

  3. Plumbing, drainage and wastewater2

    1 in the last 12 months · typically $43k

  4. Fires and heating2

    1 in the last 12 months · typically $4,626

  5. Garages, sheds and carports2

    typically $55k

  6. New homes1

    typically $612k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026November 2023: 0December 2023: 1January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 1September 2024: 0October 2024: 0November 2024: 1December 2024: 0January 2025: 0February 2025: 1March 2025: 0April 2025: 0May 2025: 1June 2025: 1July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 0May 2026: 1June 2026: 0July 2026: 2August 2026: 2September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $80kAlterations & additions to existing residence. Onsite ww. 21C Garbolino Road
  2. $80k2nd hand relocated three bdrm dwg (reconfigured workroom to add mbr with ensuite) & deck. Onsite ww 707 Settlement Road
  3. $60kRelocated second hand 2-bdrm dwg - foundations, services & onsite water water 4 Kyla Place
  4. $15kSmall hall to connect the living room with the bdrm
  5. $6,252Install new fire & flue (woodsman kanaku wood box) 679 Kaiwaka-Mangawhai Road

35 consents

  1. Alterations and additions$15k

    Small hall to connect the living room with the bdrm

    · 1 Aug 2026 · BC260305

  2. Plumbing, drainage and wastewater$80k

    Alterations & additions to existing residence. Onsite ww.

    21C Garbolino Road · 1 Aug 2026 · BC260322

  3. Relocated buildings$80k

    2nd hand relocated three bdrm dwg (reconfigured workroom to add mbr with ensuite) & deck. Onsite ww

    707 Settlement Road · 1 Jul 2026 · BC260191

  4. Fires and heating$6,252

    Install new fire & flue (woodsman kanaku wood box)

    679 Kaiwaka-Mangawhai Road · 1 Jul 2026 · BC260318

  5. Relocated buildings$60k

    Relocated second hand 2-bdrm dwg - foundations, services & onsite water water

    4 Kyla Place · 1 May 2026 · BC260153

  6. Fires and heating$3,000

    Proposed new wood burner fireplace - masport Akaroa

    17 Hayes Lane · 1 Jun 2025 · BCO10397940

  7. Alterations and additions$90k

    Dbc rbw amendment to bco10361465 two new bedrooms were added to the minor dwg to create a main dwg.

    17 Hayes Lane · 1 May 2025 · BCO10361465-A

  8. New homes$612k

    New 3 bdrm dwg with attached dbl gge. Onsite ww

    20D Valley View Lane · 1 Feb 2025 · BC240579

  9. Relocated buildings$200k

    Second hand relocated dwg - foundations & drainage onsite ww

    14 Hilltop Road · 1 Nov 2024 · BC240475

  10. Plumbing, drainage and wastewater$6,800

    rbw: alterations to laundry & toilet to combine into single room.

    12 Hilltop Road · 1 Aug 2024 · BCO10384846

  11. Alterations and additions$10k

    Turn walk-in wardrobe into en-suite bathrm

    957 Kaiwaka-Mangawhai Road · 1 Dec 2023 · BC230435

  12. Alterations and additions$85k

    4m extension to existing house

    943 Kaiwaka-Mangawhai Road · 1 Oct 2023 · BC230360

  13. Relocated buildings$180k

    Relocatable 2nd hand dwg, foundation, timber framing & deck. Onsite ww

    23 Valley View Lane · 1 Aug 2023 · BC230239

  14. Garages, sheds and carports$40k

    Detached dbl gge

    10 Kyla Place · 1 Mar 2023 · BC230032

  15. Alterations and additions$240k

    Add - bedrooms, ensuite, media room, extend hallway

    210B Wonderview Lane · 1 Nov 2022 · BC220599

  16. Relocated buildings$35k

    2nd hand relocatable dwg. Onsite ww

    58 Houkura Way · 1 Apr 2022 · BC220075

  17. Garages, sheds and carports$70k

    Construct 4 bdrm domestic dwg with attached dbl gge amendment 1: amendment 1 - cladding, bracing, connections, fire, entry passage amendment 2: swimming pool amendment 2: proposed new swimming pool

    66 Hilltop Road · 1 Nov 2021 · BC200581.A2

  18. Minor dwellings and sleepouts$4,000

    Install bathrm into existing sleepout

    111 Brown Road · 1 Sep 2021 · BC210575

  19. Plumbing, drainage and wastewater$21k

    Installation of an econotreat vbb-c-2200-2 waste water system, to service 2 future residences

    752A Settlement Road · 1 Aug 2021 · BC210471

  20. Garages, sheds and carports$16k

    Construct a 36m2 versatile gge

    8 Kyla Place · 1 Aug 2021 · BC210495

  21. Plumbing, drainage and wastewater$18k

    Waste water system installation

    111 Brown Road · 1 Jul 2021 · BC210384

  22. Fires and heating$4,600

    Installation of metro wee rad base solid fuel woodburner - replacement fire

    351 Brown Road · 1 Jun 2021 · BC210371

  23. Fires and heating$5,300

    Installation of kent Cardrona free standing solid fuel wood burner

    269 Brown Road · 1 May 2021 · BC210324

  24. Pools and spas$55k

    New kiwi 12 in ground fibreglass pool

    198 Wonderview Lane · 1 Apr 2021 · BC210173

  25. Fires and heating$38k

    Steel framed shed amendment 1: install a wood burner amendment 2: construct concrete swimming pool

    18 Lin Avenue · 1 Mar 2021 · BC180609.A2

ResidentialCommercial The dots are this page of the list.

Near Hakaru

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.