Consents in the last five years by the kind of work their description names.

  1. Alterations and additions4

    2 in the last 12 months · typically $169k

  2. Fires and heating3

    1 in the last 12 months · typically $4,000

  3. Insulation1

    1 in the last 12 months · typically $6,000

  4. Minor dwellings and sleepouts1

    1 in the last 12 months · typically $260k

  5. Repairs, recladding and strengthening1

    1 in the last 12 months · typically $40k

  6. Decks, pergolas and verandahs1

    1 in the last 12 months · typically $300k

  7. Pools and spas1

    1 in the last 12 months · typically $90k

  8. Plumbing, drainage and wastewater1

    typically $2,000

  9. New homes1

    typically $400k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0123202420252026November 2023: 0December 2023: 0January 2024: 1February 2024: 0March 2024: 0April 2024: 0May 2024: 1June 2024: 0July 2024: 0August 2024: 2September 2024: 0October 2024: 0November 2024: 0December 2024: 1January 2025: 0February 2025: 0March 2025: 0April 2025: 1May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 1December 2025: 0January 2026: 0February 2026: 0March 2026: 3April 2026: 0May 2026: 2June 2026: 0July 2026: 1August 2026: 1September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $300kRbw - the works involve renovations to part of the first floor, including bedrooms, a bathrm, & the rumpus area. The roof total area will remain, with an extension to the first-floor perimeter wal 6 Tarata Street, Kaka Point
  2. $300kAlt to dwg - add of living area, bedrooms, ensuite, entry, deck & stair - subject to section 73 notice 76 Esplanade, Kaka Point
  3. $260kHouse relocation, new subfloor foundation, deck with balustrade, minor internal alterations construct a new sleepout & deck on subfloors. 10 Kowhai Street, Kaka Point
  4. $90kRbw - construction of new pool fencing, external timber stairs & alterations to existing membrane deck. New filed showers to upper & lower bathrooms, with internal reconfiguration to main bathrm 1 Tarata Street, Kaka Point
  5. $40kAlterations to dwg. Partial reclad of north & east elevations of the dwg. New eaves flashing & guttering. Replacing all existing guttering. New joinery units. 24 Tarata Street, Kaka Point

19 consents

  1. Fires and heating$5,000

    Install new woodsman tarris mk111 solid fuel heater in home

    , Kaka Point · 1 Aug 2026 · BC260267

  2. Insulation$6,000

    Exemption - housing (detached dwg) - install replacement insulation to selected external walls of living room

    7 Totara Street, Kaka Point · 1 Jul 2026 · BC260339

  3. Alterations and additions$5,000

    Ma - changes to design

    2 Miro Street, Kaka Point · 1 May 2026 · 46737

  4. Alterations and additions$300k

    Rbw - the works involve renovations to part of the first floor, including bedrooms, a bathrm, & the rumpus area. The roof total area will remain, with an extension to the first-floor perimeter wal

    6 Tarata Street, Kaka Point · 1 May 2026 · BCO10412190

  5. Repairs, recladding and strengthening$40k

    Alterations to dwg. Partial reclad of north & east elevations of the dwg. New eaves flashing & guttering. Replacing all existing guttering. New joinery units.

    24 Tarata Street, Kaka Point · 1 Mar 2026 · 360328

  6. Decks, pergolas and verandahs$300k

    Alt to dwg - add of living area, bedrooms, ensuite, entry, deck & stair - subject to section 73 notice

    76 Esplanade, Kaka Point · 1 Mar 2026 · BCN/2026/1095

  7. Pools and spas$90k

    Rbw - construction of new pool fencing, external timber stairs & alterations to existing membrane deck. New filed showers to upper & lower bathrooms, with internal reconfiguration to main bathrm

    1 Tarata Street, Kaka Point · 1 Mar 2026 · BCO10409351

  8. Minor dwellings and sleepouts$260k

    House relocation, new subfloor foundation, deck with balustrade, minor internal alterations construct a new sleepout & deck on subfloors.

    10 Kowhai Street, Kaka Point · 1 Nov 2025 · 351427

  9. New homes$400k

    Dwg (home owner exemption )

    1 Kaihika Street, Kaka Point · 1 Apr 2025 · BC250026

  10. Plumbing, drainage and wastewater$2,000

    Res/farm - tee into existing sewer & run to proposed new section

    2 Miro Street, Kaka Point · 1 Dec 2024 · 133297

  11. Fires and heating$4,000

    Install solid fuel heater - metro tiny rad f/s woodburner

    74 Esplanade, Kaka Point · 1 Aug 2024 · 20641

  12. Fires and heating$4,000

    Install sfh - metro wee rad leg f/s woodburner

    1264 Kaka Point Road, Kaka Point · 1 Aug 2024 · 20648

  13. Alterations and additions$38k

    Extend 2 bedrooms, install new windows, cladding, roof & floor

    1264 Kaka Point Road, Kaka Point · 1 May 2024 · 20466

  14. Alterations and additions$950k

    Rbw - additions to existing ground floor with new living, kitchen, scullery & bathrm. New additions to the upper level with a new bdrm & ensuite. New gge & laundry. Joinery replacement. Re-roofing. New pool & pool fence & associate

    7 Kamahi Street, Kaka Point · 1 Jan 2024 · BCO10369705

  15. Minor dwellings and sleepouts$60k

    Demolish existing sleepout & erect 2-bdrm sleepout with bathrm

    6 Esplanade, Kaka Point · 1 Oct 2020 · 18748

  16. Minor dwellings and sleepouts$350k

    New dwg & install warmington studio f/s woodburner, ...

    44 Rata Street, Kaka Point · 1 Jan 2020 · 18444

  17. New homes$450k

    Demolish old dwg & erect new dwg & deck, install solid fuel heater - masport r5000 f/s woodburner

    82 Esplanade, Kaka Point · 1 Jan 2020 · 18463

  18. Repairs, recladding and strengthening$90k

    Replace roof & install purlins, partially reclad house, wall cladding over new cavity system

    10 Rimu Street, Kaka Point · 1 Dec 2019 · 18428

  19. Garages, sheds and carports$13k

    Erect gge

    22 Esplanade, Kaka Point · 1 Oct 2019 · 18367

ResidentialCommercial The dots are this page of the list.

Suburbs in Kaka Point

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Clutha District Council.