Building consents
Building consents in Little Wanganui
Below: 8 consents we hold in Little Wanganui, searchable and on the map.
Consents on record in Little Wanganui
Individual building consents we hold, each on its property: 8 from 1 Sep 2023 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating4
1 in the last 12 months · typically $5,000
- Relocated buildings2
typically $75k
- Alterations and additions1
1 in the last 12 months · typically $60k
- New homes1
1 in the last 12 months · typically $800k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $800kConstruction of a new res building - timber framed, light weight, 2 bedrooms, sed structural design & deck. Installation of a firenzo woodfire. Installation of res sprinkler system. 4168 Karamea Highway
- $60kConstruction of a small, prefabricated log house & installation of a wagener sparky ca 21 Horncastle Crescent
- $5,500Install masport Kaituna freestanding fire 3494 Karamea Highway
8 consents
- Alterations and additions$60k
Construction of a small, prefabricated log house & installation of a wagener sparky ca
- New homes$800k
Construction of a new res building - timber framed, light weight, 2 bedrooms, sed structural design & deck. Installation of a firenzo woodfire. Installation of res sprinkler system.
- Fires and heating$5,500
Install masport Kaituna freestanding fire
- Relocated buildings$1
Change of use - cs (crowd small) to sh (sleeping single home): additions & alterations to relocated former classroom building changed to res dwg including the installation of a shacklock multi fuel cooking stove amendment 1: . Wall bra
- Fires and heating$4,500
Install new woodsman Brunner mkii with new wetback
- Fires and heating$6,000
Installation of a Wagener Sparky freestanding multi-fuel heater
- Relocated buildings$150k
Change of use - cs (crowd small) to sh (sleeping single home): additions & alterations to relocated former classroom building changed to res dwg including the installation of a shacklock multi fuel cooking stove
- Fires and heating$3,500
Installation of a new wagener 'sparky' freestanding solid fuel burner (serial: 5122054)
ResidentialCommercial The dots are this page of the list.
Near Little Wanganui
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.