Building consents

Building consents in Kawhia

Below: 63 consents we hold in Kawhia, searchable and on the map.

Consents we hold634 in the last 12 monthsSearch them ↓

Consents on record in Kawhia

Individual building consents we hold, each on its property: 63 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Alterations and additions8

    1 in the last 12 months · typically $175k

  2. Fires and heating7

    1 in the last 12 months · typically $7,000

  3. Garages, sheds and carports5

    1 in the last 12 months · typically $130k

  4. New homes5

    1 in the last 12 months · typically $440k

  5. Relocated buildings3

    typically $70k

  6. Plumbing, drainage and wastewater3

    typically $20k

  7. Decks, pergolas and verandahs2

    typically $40k

  8. Retaining walls1

    typically $30k

  9. Repairs, recladding and strengthening1

    typically $295k

  10. Demolition1

    typically $135k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0123202420252026November 2023: 0December 2023: 2January 2024: 1February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 1July 2024: 1August 2024: 1September 2024: 2October 2024: 0November 2024: 1December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 1May 2025: 0June 2025: 3July 2025: 0August 2025: 0September 2025: 0October 2025: 2November 2025: 0December 2025: 0January 2026: 1February 2026: 1March 2026: 0April 2026: 0May 2026: 0June 2026: 2July 2026: 0August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $1.3mNew dwg - with solid fuel heater 2.0 housing: 73 Te Wetini Roore Place, Kawhia
  2. $450kNew colorsteel boat shed. Outbuilding 148 Retemeyer Road, Kawhia
  3. $35kAdd & alterations to existing decks, add of roof 410 Morrison Road, Kawhia
  4. $7,000Installation of a solid fuel heater to manufacturers detached dwg 368 Rosamond Terrace, Kawhia

63 consents

  1. Garages, sheds and carports$450k

    New colorsteel boat shed. Outbuilding

    148 Retemeyer Road, Kawhia · 1 Jun 2026 · 26/0029

  2. Fires and heating$7,000

    Installation of a solid fuel heater to manufacturers detached dwg

    368 Rosamond Terrace, Kawhia · 1 Jun 2026 · 26/0070

  3. Alterations and additions$35k

    Add & alterations to existing decks, add of roof

    410 Morrison Road, Kawhia · 1 Feb 2026 · 25/0518

  4. New homes$1.3m

    New dwg - with solid fuel heater 2.0 housing:

    73 Te Wetini Roore Place, Kawhia · 1 Jan 2026 · 25/0523

  5. Alterations and additions$387k

    Construction of a new single level 2-bdrm timber framed detached dwg

    90 Sulby Drive, Kawhia · 1 Oct 2025 · 25/0118

  6. Plumbing, drainage and wastewater$20k

    On-site wastewater management system: secondary treatment detached dwg

    471 Hoturoa Street, Kawhia · 1 Oct 2025 · 25/0122

  7. New homes$440k

    Two bdrm res house, with septic system & water detached dwg

    130 Okapu Place, Kawhia · 1 Jun 2025 · 25/0069

  8. Alterations and additions$480k

    Proposed add/alt to existing split storey detached dwg

    173B Pearl Avenue, Kawhia · 1 Jun 2025 · 25/0079

  9. Fires and heating$7,000

    Supply & install wood burner detached dwg

    504 Rosamond Terrace, Kawhia · 1 Jun 2025 · 25/0087

  10. Garages, sheds and carports$95k

    New colorsteel gge. Outbuilding

    257B Waiwera Street, Kawhia · 1 Apr 2025 · 25/0029

  11. Plumbing, drainage and wastewater$30k

    proposed drainage & piling of transportable building

    905 Pouewe Street, Kawhia · 1 Nov 2024 · 24/0137

  12. Relocated buildings$50k

    Relocated cottage detached dwg

    39 Lake Road, Kawhia · 1 Sep 2024 · 24/0112

  13. Demolition$135k

    Demolish & rebuild 2 bdrm sleepout with toilet & detached dwg

    44 Kaora Street, Kawhia · 1 Sep 2024 · 24/0118

  14. Fires and heating$2,500

    Installation of new solid fuel heater detached dwg

    474 Rosamond Terrace, Kawhia · 1 Aug 2024 · 24/0098

  15. Relocated buildings$70k

    New relocated dwg with new timber pile foundations & detached dwg

    378 Tahuri Street, Kawhia · 1 Jul 2024 · 24/0064

  16. New homes$175k

    Transportable dwg shifted onto site - foundations & detached dwg

    241 Cowell Street, Kawhia · 1 Jun 2024 · 24/0076

  17. Relocated buildings$120k

    Relocation of new transportable building built offsite under detached dwg

    69 Korotangi Place, Kawhia · 1 Jan 2024 · 23/0121

  18. Decks, pergolas and verandahs$40k

    Construction of a new deck detached dwg

    63 Korotangi Place, Kawhia · 1 Dec 2023 · 220060A

  19. Alterations and additions$350k

    To build existing dwg on top of an existing block detached dwg

    293 Cooper Drive, Kawhia · 1 Dec 2023 · 23/0108

  20. Repairs, recladding and strengthening$295k

    Alterations & additions: reroof, reclad, add of lift, detached dwg

    194 Moke Street, Kawhia · 1 Oct 2023 · 23/0107

  21. Fires and heating$7,000

    Installation of a solid fuel heater as per manufacturers detached dwg

    98 Raglan Road, Kawhia · 1 Sep 2023 · 23/0094

  22. Fires and heating$9,200

    Install wagener cooktop rural wood burner with triumph 250l detached dwg

    60 Raglan Road, Kawhia · 1 Aug 2023 · 23/0087

  23. Fires and heating$5,000

    Installation of a metro wee rad base solid fuel fire detached dwg

    154 Davies Drive, Kawhia · 1 Aug 2023 · 23/0090

  24. Garages, sheds and carports$150k

    Versatile shed outbuilding

    147 Maukutea Drive, Kawhia · 1 Apr 2023 · 22/0196

  25. Alterations and additions$50k

    Transportable four bdrm dwg foundations & services detached dwg

    61 Ocean Ridge Place, Kawhia · 1 Apr 2023 · 23/0030

ResidentialCommercial The dots are this page of the list.

Suburbs in Kawhia

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.