Building consents · Stats NZ figures to September 2026
Residential building consents in Waitangi
314 new homes were consented in the Far North District council area in the year to September 2026, up 38% on the year before. In the statistical area around Waitangi, 4 new homes were consented in the same year. Below: 63 residential consents we hold in Waitangi, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area, and new homes down to statistical areas, which is how Waitangi’s own count is made.
New homes consented each month
Dwellings in new building consents, Far North District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 541 in 2004.
What kind of homes
New dwellings consented in the year to September 2026, by type, with the average floor area and value Stats NZ’s figures give.
- Houses222
132 m² average · $462k average value · +16% on the year before
- Townhouses, flats and units80
76 m² average · $233k average value · +1043% on the year before
- Retirement village units9
100 m² average · $351k average value · −68% on the year before
- Apartments3
326 m² average · $667k average value
New homes in Waitangi
Stats NZ’s new dwellings for the statistical area Waitangi sits in (Puketona-Waitangi) — the suburb is smaller than one. In the year to September 2026: 4 houses, 0 townhouses and units, 0 apartments.
Residential consents on record in Waitangi
Individual building consents we hold, each on its property: 63 from 9 Aug 1993 to 14 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions6
2 in the last 12 months
- Repairs, recladding and strengthening1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
63 consents
- Alterations and additions
Canopy structure and concrete pathway
- Alterations and additions
Demolish small area of building, remove all wall and roof cladding & linings, remove all hardstand. New addition & altered interior layout, new cladding, roofing & interior linings, new covered deck, new verandah, new hardstand & landscaping
- Alterations and additions
Access Controlled Doors
- Repairs, recladding and strengthening
Re-roof of existing Visitors Centre, change of material from membrane shingle roof to profiled metal roof
- Alterations and additions
Reduced Scope of work - Building A no longer included in Refurbishment
- Alterations and additions
Replacement ablution block
- Alterations and additions
addition to Block D room refurbishment, the same type of refurbishment is going to be conducted in Buildings A, B, C including replacing the hot water system, upgrading ventilation and replacing the distribution boards.
- Fires and heating
Install of a Yunca Wegj Rural Free-Standing Wood Burner, Flue Kit and Pan Flashing
- Garages, sheds and carports
Versatile Stand-Tough Shed
- Plumbing, drainage and wastewater
Erect 80,000 Litre Timber Water Tank To Connect To Existing Sprinkler System
- Fires and heating
Amendment to Replace Existing HWC with Gas Califont Hot Water Heater and Gas Bottle Enclosure
- Alterations and additions
Cut New Window into Existing Block Wall
- Alterations and additions
Stage 4 – Completing Balance of Works
- Alterations and additions
Stage 3B - Foundations, Block Foundation Walls Structural Steel and Timber for the Multipurpose Area Only
- Alterations and additions
Stage 3 - Foundations, Structural Steel, Pre-Cast Concrete Wall Panels for the Gallery Building Area Only
- Plumbing, drainage and wastewater
Stage 2 - Bulk Earthworks and New Stormwater Drain
- Alterations and additions
Addition of Shower Block to Existing Building
- Alterations and additions
Stage 1
- Alterations and additions
Amendment To Replace Concrete Floor With Timber In Visitors Centre Of John Scott Building
- Alterations and additions
Roof Changes To Membrane and Structure
- Alterations and additions
Upgrade to Fire Sprinkler, water supply including NZFS alternative supply tank
- Alterations and additions
Upgrade Existing Sprinkler System
- Decks, pergolas and verandahs
Demolition of Existing Roof and Construction of New Roof, New Deck and Verandah Roof
- Alterations and additions
Upgrade existing Viewing Platform
- New homes
Construct New Structure and Roof to House Hangi Pit
ResidentialCommercial The dots are this page of the list.
Near Waitangi
Questions
How many building consents were issued in Waitangi?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.