Building consents

Residential building consents in Kuku

Below: 15 residential consents we hold in Kuku, searchable and on the map.

Consents we hold154 in the last 12 monthsSearch them ↓

Residential consents on record in Kuku

Individual building consents we hold, each on its property: 15 from 1 Sep 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating6

    2 in the last 12 months · typically $5,500

  2. Garages, sheds and carports2

    1 in the last 12 months · typically $134k

  3. Alterations and additions1

    1 in the last 12 months · typically $36k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

00111202420252026November 2023: 0December 2023: 0January 2024: 0February 2024: 0March 2024: 0April 2024: 0May 2024: 0June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 0December 2024: 0January 2025: 0February 2025: 0March 2025: 0April 2025: 0May 2025: 1June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 1December 2025: 0January 2026: 0February 2026: 0March 2026: 1April 2026: 0May 2026: 1June 2026: 0July 2026: 1August 2026: 0September 2026: 0October 2026: 0

Largest in the last 12 months

  1. $210kNew internal gge & covered patio extension to existing house 663 State Highway 1, Kuku
  2. $36kNew yard built dwg relocate to site to relocate this 3 bdrm brand new yard built dwg to site as per site plan as well as a new septic system & fireplace 570 Kuku Beach Road, Kuku
  3. $8,300Fireplace - inbuilt to supply & install a new firenzo athena bay inbuilt wood burner 252 Kuku Beach Road, Kuku
  4. $6,800Fireplace freestanding remove existing wood-burner & replace with new 287 Kuku East Road, Kuku

15 consents

  1. Fires and heating$6,800

    Fireplace freestanding remove existing wood-burner & replace with new

    287 Kuku East Road, Kuku · 1 Jul 2026 · 2026/228

  2. Fires and heating$8,300

    Fireplace - inbuilt to supply & install a new firenzo athena bay inbuilt wood burner

    252 Kuku Beach Road, Kuku · 1 May 2026 · 2026/152

  3. Alterations and additions$36k

    New yard built dwg relocate to site to relocate this 3 bdrm brand new yard built dwg to site as per site plan as well as a new septic system & fireplace

    570 Kuku Beach Road, Kuku · 1 Mar 2026 · 2025/549

  4. Garages, sheds and carports$210k

    New internal gge & covered patio extension to existing house

    663 State Highway 1, Kuku · 1 Nov 2025 · BC240534

  5. Fires and heating$5,000

    Fireplace freestanding to supply & install a new metro wee rad leg Ltd to replace existing

    , Kuku · 1 May 2025 · 2025/150

  6. Fires and heating$2,500

    Fireplace freestanding install freestanding spiroloc fire

    72 Kuku Beach Road, Kuku · 1 Sep 2023 · 2023/340

  7. Fires and heating$6,000

    Fireplace freestanding to supply & install a new Ltd xtreme rad woody freestanding wood burner to replace existing with wetback

    61 Kuku East Road, Kuku · 1 Apr 2023 · 2023/95

  8. Fires and heating$700

    Fireplace freestanding installing masport r1500 woodstacker freestanding firebox & flue

    137 Kuku Beach Road, Kuku · 1 Jul 2022 · 2022/308

  9. Garages, sheds and carports$58k

    Gge/shed - no services construction of a new 9.0m long x 6.0m wide gge hobby room

    248 Kuku East Road, Kuku · 1 Dec 2021 · 2021/867

  10. Alterations and additions$25k

    Res additions & alterations installation of biolytix multi-pod wastewater treatment system plus dripper irrigation, to replace existing septic tank which was installed c 1988.

    359D Kuku East Road, Kuku · 1 May 2021 · 2021/227

  11. Garages, sheds and carports$39k

    Gge/shed - no services construction of a new 9.0m x 7.0m non-habitable dbl gge

    105 Hoggs Road, Kuku · 1 Mar 2021 · BC2021/55

  12. Alterations and additions$90k

    Res additions & alterations extension of lounge & extension of master bdrm with new ensuite being added.

    78 Hoggs Road, Kuku · 1 Jan 2021 · 2021/891

  13. Fires and heating$5,400

    Fireplace freestanding installation of a new wagener sparky freestanding wood fire, flue system, flue shield & flashing

    , Kuku · 1 Jan 2021 · BC2020/674

  14. Relocated buildings$30k

    Existing dwg relocated onto site movement of relocatable shed onto new foundations

    547 Kuku Beach Road, Kuku · 1 Oct 2020 · BC2020/445

  15. New homes$250k

    New res dwg construction of a new three bdrm, one bathrm res dwg with attached single gge, ...

    72 Kuku Beach Road, Kuku · 1 Sep 2020 · BC2020/342

ResidentialCommercial The dots are this page of the list.

Suburbs in Kuku

Where the consents we hold are, most in the last 12 months first.

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.